Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/10626
Title: O método de gerenciamento de melhorias contínuas aplicada na mineração Caraíba S/A.
Other Titles: The continuous improvement management method applied in Caribbean mining S.A.
???metadata.dc.creator???: GURJÃO FILHO, Emir.
???metadata.dc.contributor.advisor1???: BAZANTE, Arlindo José.
???metadata.dc.contributor.referee1???: SOARES, José Agnelo.
???metadata.dc.contributor.referee2???: COSTA, José César de Albuquerque.
Keywords: Mineração - planejamento de mina subterrânea;Mineração Caraíba;Mina Subterrânea;Características Gerais do Método de Melhorias PDCA;Técnica de Desmonte para Alívio de Tensões - Destress Blasting;Underground Mine;PDCA Enhancement Method Overview;Caribbean Mining;Mining - Underground Mine Planning;Stress Relief Disassembly Technique - Destress Blasting
Issue Date: 4-May-2012
Publisher: Universidade Federal de Campina Grande
Citation: GURJÃO FILHO, Emir. O método de gerenciamento de melhorias contínuas aplicada na mineração Caraíba S/A. 64f. (Dissertação de Mestrado em Engenharia de Minas), Programa de Pós-Graduação em Engenharia de Minas, Centro de Ciências e Tecnologia, Universidade Federal de Campina Grande – Paraíba Brasil, 2012. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/10626
???metadata.dc.description.resumo???: Este trabalho discute a aplicação pratica do método de melhoria continua na mineração, em um estudo de caso, em que, a princípio, não se sabe qual a causa principal do não cumprimento das metas traçadas pelo setor de planejamento de uma mina subterrânea, mais precisamente no setor de desenvolvimento da Mineração Caraba SA. Com a aplicação do método "PDCA", encontra-se o motivo principal pelo avanço abaixo do previsto, obtido no desenvolvimento da galena de acesso principal (leste e oeste) do 7° painel de lavra, detectando os problemas e ordenando-os por prioridade, dando as devidas soluções. Como solução, no caso principal, foi aplicado o método de Destress Blasting, que e um método de furos de alivio de tensão. Na sequencia foram detectadas outras situações que obstruíam o cumprimento das metas e seus resultados, as quais também foram resolvidas.
Abstract: This paper discusses the practical application of the continuous improvement method in mining, in a case study, where, at first, it is not known what is the main cause of fulfillment of the goals set by the planning department of an underground mine, more precisely in the development sector of Mineração Caraba SA. With the application of the "PDCA" method, one finds the main reason for the less than expected advance, obtained in the development of the main access panel (east and west) of the 7th mining panel, detecting the problems and sorting them by priority. , giving the appropriate solutions. As a solution, in the main case, the Destress Blasting method, which is a strain relief hole method, was applied. Following, other situations were detected that obstructed the accomplishment of the goals and their results, which were also resolved.
Keywords: Mineração - planejamento de mina subterrânea
Mineração Caraíba
Mina Subterrânea
Características Gerais do Método de Melhorias PDCA
Técnica de Desmonte para Alívio de Tensões - Destress Blasting
Underground Mine
PDCA Enhancement Method Overview
Caribbean Mining
Mining - Underground Mine Planning
Stress Relief Disassembly Technique - Destress Blasting
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/10626
Appears in Collections:Mestrado em Engenharia de Minas

Files in This Item:
File Description SizeFormat 
EMIR GURJÃO FILHO - DISSERTAÇÃO PPGEMinas 2012.pdfEmir Gurjão Filho - Dissertação PPGEMinas 20124.82 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.