Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/10711
Title: Proposta de um modelo de planejamento e controle de execução para usina piloto no campus CCTA/UFCG na cidade de Pombal-PB.
Other Titles: Proposal of a planning and execution control model for pilot plant at CCTA / UFCG campus in Pombal-PB.
???metadata.dc.creator???: PEREIRA, Daniel Silas Oliveira.
???metadata.dc.contributor.advisor1???: SILVA, Elisângela Pereira da.
???metadata.dc.contributor.referee1???: MEDEIROS, Fernanda Karolline de.
???metadata.dc.contributor.referee2???: MEDEIROS, Eduardo Morais de.
???metadata.dc.contributor.referee3???: FRANÇA, Yghor Sulpino.
Keywords: Construção civil;Construction;Planejamento de obra;Construction planning;Controle de obra;Construction control;Planejamento;Planning;Níveis hierárquicos;Hierarchical levels;Programação semanal;Programming
Issue Date: 21-Nov-2019
Publisher: Universidade Federal de Campina Grande
Citation: PEREIRA. Daniel Silas Oliveira. Proposta de um modelo de planejamento e controle de execução para usina piloto no campus CCTA/UFCG na cidade de Pombal-PB. 2019. 96 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Centro de Ciências e Tecnologia Agroalimentar, Universidade Federal de Campina Grande, Pombal, Paraíba, Brasil, 2019.
???metadata.dc.description.resumo???: A construção civil ainda sofre com a ausência de planejamento e controle de suas obras, especificamente, em obras de pequeno e médio porte em que o controle dos prazos das atividades é feito de maneira informal. Esse é um desafio do setor que vem buscando introduzir com eficácia um sistema de programação dentro das empresas. Dessa forma, o presente trabalho tem por objetivo propor um modelo de planejamento e controle que possa servir para aplicação em empresas de pequeno e médio porte. O método de pesquisa utilizado foi a pesquisa-ação, realizada em uma obra pública de médio porte na cidade de Pombal-PB. O planejamento foi subdividido em níveis hierárquicos a longo, médio e curto prazo, com o intuito de aumentar o controle dos prazos das atividades. Houve desafios na implantação do modelo por ter sido implementado com a obra em andamento. Mesmo havendo variação nos resultados do Percentual de Planejamento Concluído (PPC), o valor médio foi igual a 79,56%, indicando que a programação foi eficaz. A utilização do indicador de desempenho da programação semanal, permitiu uma melhor percepção em relação ao controle dos serviços, além disso, facilitou na visualização das principais causas que impediram o cumprimento das metas. A partir da análise dos indicadores gerados é possível observar uma variação entre o planejamento e a execução na prática. Porém, trata-se de um processo com melhoria contínua, pois trata de uma metodologia que envolve uma mudança cultural da empresa.
Abstract: Civil construction still suffers from the lack of planning and control of its works, specifically in small and medium-sized works where the control of the deadlines of activities is done informally. This is an industry challenge that has been seeking to effectively introduce a programming system within companies. Thus, the present work aims to propose a planning and control model that can be used for small and medium size companies. The research method used was action research, carried out in a medium-sized public work in the city of Pombal-PB. The planning was subdivided into long, medium and short term hierarchical levels, in order to increase the control of the activity deadlines. There were challenges in the implementation of the model because it was implemented with the work in progress. Even with variation in the PPC results, the average value was equal to 79.56%, indicating that the programming was effective. The use of the programming performance indicator, allowed a better perception regarding the control of services, besides facilitating the visualization of the main causes that prevented the accomplishment of the goals. From the analysis of the generated indicators it is possible to observe a variation between the planning and the execution in practice. However, it is a process with continuous improvement, because it is a methodology that involves a cultural change of the company.
Keywords: Construção civil
Construction
Planejamento de obra
Construction planning
Controle de obra
Construction control
Planejamento
Planning
Níveis hierárquicos
Hierarchical levels
Programação semanal
Programming
???metadata.dc.subject.cnpq???: Engenharia Civil.
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/10711
Appears in Collections:Curso de Bacharelado em Engenharia Civil - CCTA

Files in This Item:
File Description SizeFormat 
DANIEL SILAS OLIVEIRA PEREIRA - TCC - ENGENHARIA CIVIL 2019.pdfDaniel Silas Oliveira Pereira - TCC - Engenharia Civil 2019.7.63 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.