Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/18871
Title: Dimensionamento de MOV para proteção de bancos de capacitores série.
Other Titles: Sizing of MOV for protection of series capacitor banks.
???metadata.dc.creator???: BARBOSA, Hiago Richard Santa Cruz Martins.
???metadata.dc.contributor.advisor1???: DANTAS, Karcius Marcelus Colaço.
???metadata.dc.contributor.referee1???: LIRA, George Rossany Soares de.
Keywords: Bancos de capacitores - proteção;MOV - dimensionamento;Proteção de bancos de capacitores;Dimensionamento de MOV;Compensação série;Capacitores série;Metal Oxide Varistor - MOV;Capacitor banks - protection;MOV - dimensioning;Protection of capacitor banks;Sizing of MOV;Series compensation;Series capacitors
Issue Date: 2018
Publisher: Universidade Federal de Campina Grande
Citation: BARBOSA, Hiago Richard Santa Cruz Martins. Dimensionamento de MOV para proteção de bancos de capacitores série. 2018. 51f. (Trabalho de Conclusão de Curso - Monografia), Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática , Universidade Federal de Campina Grande – Paraíba - Brasil, 2018. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/18871
???metadata.dc.description.resumo???: Este trabalho mostra o procedimento para dimensionar os MOVs (Metal Oxide Varistors) dos Bancos de Capacitores Série (BCS) 05C5 e 05C6 localizados na Subestação de São João do Piauí. São determinadas as energias absorvidas por cada MOV para que estes sejam dimensionados corretamente para suportar as solicitações advindas de curto-circuito no sistema elétrico. O software ATP (Alternative Transient Program) foi utilizado para simular o sistema elétrico no horizonte de 2022 bem como o esquema elétrico dos BCS e o sistema de controle da proteção, este último utilizando a linguagem TACS. Foram determinados o nível de corrente de curto-circuito e energia a que os MOVs podem ser submetidos e que servem como parâmetro para realizar ou não o by-pass do BCS. Para isso simulou-se diversas faltas no sistema de forma a ajustar a proteção para as condições mais severas e avaliou-se o desempenho do ajuste encontrado. Também foi comparado o ajuste proposto com o atual e verificou-se que o ajuste vigente ficará obsoleto para o sistema do horizonte citado. Os parâmetros de ativação do Spark Gap por corrente foram superados, os de energia permaneceram próximos aos atuais. A energia nominal de um dos MOV, na linha Boa Esperança – São João do Piauí encontrada foi cerca de duas vezes o valor anterior, enquanto que a energia do MOV localizado no circuito 1 da linha entre São João do Piauí e Sobradinho permaneceu próxima ao valor anterior.
Abstract: This work shows the procedure for dimensioning the Metal Oxide Varistors (MOVs) of the Series Capacitor Banks (BCS) 05C5 and 05C6 located in the São João do Piauí Substation. The energies absorbed by each MOV are determined so that they are correctly sized to withstand short-circuit requests in the electrical system. The ATP (Alternative Transient Program) software was used to simulate the electrical system in the 2022 horizon as well as the electric scheme of the BCS and the protection control system, the latter using the TACS language. The level of short-circuit current and energy to which the MOVs can be submitted and which serve as a parameter to carry out BCS ¬by-pass or not is determined. For this, several faults were simulated in the system in order to adjust the protection for the most severe conditions and the performance of the found adjustment was evaluated. It was also compared the proposed adjustment with the current one and it was verified that the current adjustment will be obsolete for the system of the mentioned horizon. The parameters of activation of the Spark Gap by current were overcome, those of energy remained close to the current ones. The nominal energy of one of the MOVs in the Boa Esperança line - São João do Piauí found was about twice the previous value, while the MOV energy located in line 1 of the line between São João do Piauí and Sobradinho remained close to the value previous.
Keywords: Bancos de capacitores - proteção
MOV - dimensionamento
Proteção de bancos de capacitores
Dimensionamento de MOV
Compensação série
Capacitores série
Metal Oxide Varistor - MOV
Capacitor banks - protection
MOV - dimensioning
Protection of capacitor banks
Sizing of MOV
Series compensation
Series capacitors
???metadata.dc.subject.cnpq???: Engenharia Elétrica.
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/18871
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Monografias

Files in This Item:
File Description SizeFormat 
HIGO RICHARD SANTA CRUZ MARTINS BARBOSA - TCC ENG. ELÉTRICA 2018.pdfHigo Richard Santa Cruz Martins Barbosa - TCC Eng. Elétrica 2018.807.85 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.