Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/19119
Title: Estudo de caso das instalações elétricas da Unidade Terapia Intensiva do Real Hospital Português .
Other Titles: Case study of the electrical installations of the Intensive Care Unit of the Real Hospital Português.
???metadata.dc.creator???: NASCIMENTO, Diogo Marques.
???metadata.dc.contributor.advisor1???: SILVA, Célio Anésio da.
???metadata.dc.contributor.referee1???: ARAÚJO, Jalberth Fernandes de.
Keywords: Instalações elétricas hospitalares;Hospital -instalações elétricas;Hospital Real Português - instalações elétricas;Proteção elétrica do paciente;Equipamento eletromédico;Hospital electrical installations;Hospital - electrical installations;Hospital Real Português - electrical installations;Electrical patient protection;Electromedical equipment
Issue Date: 23-Nov-2020
Publisher: Universidade Federal de Campina Grande
Citation: NASCIMENTO, Diogo Marques. Estudo de caso das instalações elétricas da Unidade Terapia Intensiva do Real Hospital Português. 2020. 58f. (Trabalho de Conclusão de Curso - Monografia), Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática , Universidade Federal de Campina Grande – Paraíba - Brasil, 2020. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/19119
???metadata.dc.description.resumo???: Neste trabalho é abordado o estudo de caso das instalações elétricas da Unidade de Terapia Intensiva do Real Hospital Português de Beneficência em Pernambuco (RHP), local do Grupo 2 dos Estabelecimentos Assistenciais de Saúde (EAS). Os equipamentos e as instalações elétricas que são utilizados nestes ambientes devem receber energia de qualidade devido às exigências de confiabilidade e segurança que estes estabelecimentos devem oferecer. Para garantir o fornecimento de energia ininterrupta, exigência de locais como Unidades de Terapia Intensiva (UTI) e Centros Cirúrgicos, por exemplo, devem ser alimentados pelo esquema de aterramento Sistema IT Médico. Este trabalho traz, de maneira clara e sucinta, o que especifica as normas NBR 13534, NBR 5410 e a RDC nº 50ª, além da aplicação destas normas na UTI do Real Hospital Português, local do grupo 2, objeto de estudo deste trabalho. Foi possível concluir que é importante que se tenha um projeto elétrico obedecendo às normas vigentes para este tipo de instalação. E também é primordial a integração entre as áreas da Engenharia Clínica, Engenharia Elétrica e o Corpo Médico para conseguir satisfazer as demandas que os EAS exigem. Além de que se deve investir mais recursos nestas instalações e principalmente no Sistema IT Médico para evitar acidentes aos pacientes e corpo clínico, garantindo a segurança e confiabilidade no fornecimento de energia elétrica para os ambientes do grupo 2.
Abstract: This work deals with the case study of the electrical installations of the Intensive Care Unit of the Real Hospital Português de Beneficência in Pernambuco (RHP), site of Group 2 of Health Care Establishments (EAS). The equipment and electrical installations that are used in these environments must receive quality energy due to the requirements of reliability and safety that these establishments must offer. To guarantee the supply of uninterrupted energy, the requirement of places such as Intensive Care Units (ICUs) and Surgical Centers, for example, must be powered by the Medical IT System grounding scheme. This work brings, in a clear and succinct way, what specifies the standards NBR 13534, NBR 5410 and RDC nº 50ª, in addition to the application of these standards in the ICU of Real Hospital Português, site of group 2, object of study of this work. It was possible to conclude that it is important to have an electrical project complying with the current regulations for this type of installation. And it is also essential to integrate the areas of Clinical Engineering, Electrical Engineering and the Medical Staff in order to be able to satisfy the demands that EAS require. In addition, more resources should be invested in these facilities and especially in the Medical IT System to prevent accidents to patients and the medical staff, ensuring safety and reliability in the supply of electrical energy for the group 2 environments.
Keywords: Instalações elétricas hospitalares
Hospital -instalações elétricas
Hospital Real Português - instalações elétricas
Proteção elétrica do paciente
Equipamento eletromédico
Hospital electrical installations
Hospital - electrical installations
Hospital Real Português - electrical installations
Electrical patient protection
Electromedical equipment
???metadata.dc.subject.cnpq???: Engenharia Elétrica.
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/19119
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Monografias

Files in This Item:
File Description SizeFormat 
DIOGO MARQUES NASCIMENTO - TCC ENG. ELÉTRICA 2020.pdfDiogo Marques Nascimento - TCC Eng. Elétrica 2020.4.56 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.