Title: Análises das causas dos atrasos em duas obras públicas localizadas na cidade de Pombal-PB
Other Titles: Analysis of the causes of delays in two public works located in the city of Pombal-PB
???metadata.dc.creator???: BATISTA, Karinne Martins.
???metadata.dc.contributor.advisor1???: MEDEIROS, Eduardo Morais de.
???metadata.dc.contributor.referee1???: SOUSA NETO, Valter Ferreira de.
???metadata.dc.contributor.referee2???: SOUZA, Thyago Lima.
Keywords: Construção civil;Construction;Obras públicas;Public works;Autarquia;Autarchy;Gerenciamento de projetos;Project management;Aditivos de prazo;Deadline additives
Issue Date: 9-Oct-2020
Publisher: Universidade Federal de Campina Grande
Citation: BATISTA, K. M. Análises das causas dos atrasos em duas obras públicas localizadas na cidade de Pombal-PB. 2020. 122 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Centro de Ciências e Tecnologia Agroalimentar, Universidade Federal de Campina Grande, Pombal, Paraíba, Brasil, 2020.
???metadata.dc.description.resumo???: É notório que as obras e serviços realizados pela autarquia representam significativamente a maior parte do que se movimenta financeiramente no setor de construção do país. Porém, mesmo com tal representatividade, é evidente a dificuldade que essa possui em realizar seus empreendimentos dentro do prazo, custo e padrão de qualidade almejado. Nesse sentido, o presente estudo procurou investigar as principais causas que contribuem para os atrasos em edificações públicas localizadas na cidade de Pombal-PB, afim de servir como base para minimizar tais prejuízos. Para isso, realizou-se previamente uma análise documental com todos os processos administrativos das obras em questão, de modo a se correlacionar todos os fatores associados à gestão do tempo. Em complemento, conduziu-se conversações com os engenheiros responsáveis, onde os mesmos identificaram as causas dos atrasos em cada serviço executado, além de classificarem, perante aspectos de impacto e influência, fatores globais das incidências nas construções. Assim, os resultados apontaram que as causas se equivaleram praticamente a ambos os empreendimentos. Então, sabendo-se disso, pode-se afirmar que as principais motivações dos aditamentos em contratos são: falhas na elaboração de projetos e cronogramas, ausência de investigação do solo, atrasos na tomada de decisões e dificuldades financeiras das empreiteiras, inexistência de motivação e baixa produtividade da mão de obra, além da ausência de controle das atividades executadas. Ademais, como propósito de auxiliar os gestores na resolução de tais problemas, sugeriu-se algumas recomendações eficazes levando em consideração o melhor custo-benefício para as organizações. Por fim, concluiu-se que para minimizar tais atrasos, é primordial o aprimoramento no modo que estes são gerenciados, implementando práticas que priorizem a integralização do projeto com a execução.
Abstract: It is notorious that the works and services carried out by the autarchy represent significantly most of what moves financially in the country's construction sector. However, even with such representativeness, it is evident the difficulty it has in carrying out its projects within the time, cost and quality standard desired. In this sense, the present study sought to investigate the main causes that contribute to the delays in public buildings located in the city of Pombal-PB, in order to serve as a basis to minimize such losses. For this, a documental analysis with all the administrative processes of the works in question was previously performed, in order to correlate all the factors associated with time management. In addition, discussions were held with the engineers responsible, where they identified the causes of delays in each service performed, in addition to classifying, in relation to aspects of impact and influence, global factors of the incidences in the constructions. Thus, the results pointed out that the causes were practically equivalent to both enterprises. So, knowing this, it can be affirmed that the main motivations of the additions in contracts are: failures in the elaboration of projects and schedules, absence of investigation of the soil, delays in the taking of decisions and financial difficulties of the contractors, inexistence of motivation and low productivity of the labor, besides the absence of control of the executed activities. Moreover, as a purpose to help managers in solving such problems, some effective recommendations were suggested taking into consideration the best cost-benefit for the organizations. Finally, it was concluded that to minimize such delays, it is essential to improve the way they are managed, implementing practices that prioritize the integration of the project with execution.
Keywords: Construção civil
Construction
Obras públicas
Public works
Autarquia
Autarchy
Gerenciamento de projetos
Project management
Aditivos de prazo
Deadline additives
???metadata.dc.subject.cnpq???: Engenharia Civil.
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/19422
Appears in Collections:Curso de Bacharelado em Engenharia Civil - CCTA

Files in This Item:
File Description SizeFormat 
KARINNE MARTINS BATISTA – TCC – BACHARELADO EM ENGENHARIA CIVIL 2020.pdfKarinne Martins Batista – TCC – Bacharelado em Engenharia Civil 2020.3.02 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.