Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20020
Title: Relatório de estágio supervisionado.
Other Titles: Supervised internship report.
???metadata.dc.creator???: NOLE, Áquila Borba.
???metadata.dc.contributor.advisor1???: MEIRA, Ubirajara Rocha.
???metadata.dc.contributor.referee1???: OLIVEIRA, Leimar de.
Keywords: Estágio em Engenharia Elétrica;Energy Eletricidade LTDA;Rede de média tensão;Linha de transmissão;Complexo Eólico Vila Acre;Complexo Eólico Santo Inácio;Resistência do solo;Internship in Electrical Engineering;Energy Electricity LTDA;Medium voltage network;Transmission line;Vila Acre Wind Complex;Santo Inácio Wind Complex;Soil strength
Issue Date: 2017
Publisher: Universidade Federal de Campina Grande
Citation: NOLE, Áquila Borba. Relatório de estágio supervisionado. 2017. 38f. (Relatório de Estágio Supervisionado) Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática, Universidade Federal de Campina Grande - Paraíba - Brasil, 2017. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20020
???metadata.dc.description.resumo???: O presente relatório tem por objetivo apresentar, de forma sintetizada, os conhecimentos adquiridos, bem como as atividades realizadas durante o estágio supervisionado na empresa Energy Eletricidade Ltda, empresa do ramo de concepção, desenvolvimento e execução de projetos el tricos. O per odo de realiza o do estágio foi compreendido entre os dias 1 de janeiro de 2017 e 13 de abril de 2017. As atividades realizadas pelo estagiário se concentraram na participação da execução de dois empreendimentos principais: a rede aérea de mé dia tensão que interconecta os geradores eólicos dos recé m construídos parques Vila Acre I & Vila Acre II à uma subesta ção preexistente, bem como a execução da linha e transmissão de 230kV responsável pela conexão entre a subesta ção elevadora de 34,5/230 kV do Complexo Eólico Santo Inácio à subesta ção Mossor IV. Os mesmos atenderam a todos os requerimentos e objetivos propostos.
Abstract: The purpose of this report is to describe, in a summarized way, the knowledge acquired, as well as the activities carried out during the supervised internship at the company Energy Eletricidade Ltda, a company in the field of design and execution of electrical projects. The internship period was comprised between January 1, 2017 and April 13, 2017. The activities carried out by the trainee focused on the participation of the implementation of two main projects: the medium voltage aerial network that interconnects the wind generators of the newly built Vila Acre I & Vila Acre II wind power plants to a pre-existing substation, as well as the execution of the 230 kV transmission line responsible for the connection between the 34.5 / 230 kV substation of the Santo In cio Wind Complex and the Mossor IV substation. They met all the requirements and objectives proposed.
Keywords: Estágio em Engenharia Elétrica
Energy Eletricidade LTDA
Rede de média tensão
Linha de transmissão
Complexo Eólico Vila Acre
Complexo Eólico Santo Inácio
Resistência do solo
Internship in Electrical Engineering
Energy Electricity LTDA
Medium voltage network
Transmission line
Vila Acre Wind Complex
Santo Inácio Wind Complex
Soil strength
???metadata.dc.subject.cnpq???: Engenharia Elétrica.
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20020
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio

Files in This Item:
File Description SizeFormat 
ÁQUILA BORBA NOLE - RELATÓRIO DE ESTÁGIO ENG. ELÉTRICA 2017.pdfÁquila Borba Nole - Relatório de Estágio Eng. Elétrica 2017.5.04 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.