Please use this identifier to cite or link to this item:
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20065
Title: | Relatório de estágio. |
Other Titles: | Rapport de stage. |
???metadata.dc.creator???: | CARVALHO, Gabriela Sobreira Dias de. |
???metadata.dc.contributor.advisor1???: | ALENCAR, Marcelo Sampaio de. |
???metadata.dc.contributor.referee1???: | FONTGALLAND, Glauco. |
Keywords: | Estágio em Engenharia Elétrica;SAVENGE - engenharia de Telecomunicações LTDA;TIM - Projeto LTE 700;Stage en Génie Electrique;SAVENGE - Ingénierie des télécommunications LTDA;TIM - Projet LTE 700;Internship in Electrical Engineering;SAVENGE - Telecommunications Engineering LTDA;TIM - LTE 700 Project |
Issue Date: | Aug-2017 |
Publisher: | Universidade Federal de Campina Grande |
Citation: | CARVALHO, Gabriela Sobreira Dias de. Relatório de estágio. 2017. 30f. (Relatório de Estágio ) Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática, Universidade Federal de Campina Grande - Paraíba - Brasil, 2017. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20065 |
???metadata.dc.description.resumo???: | Este relatório apresenta as principais atividades realizadas durante o estágio curricular supervisionado na empresa SAVENGE Engenharia LTDA, enquadrado na área de concentração das Telecomunicações, durante o período de 02 de maio a 31 de julho de 2017. A estagiária foi alocada no projeto “LTE 700 TIM” que se refere a implantação de sistemas móveis de quarta geração (4G) da operadora TIM, em 700MHz. A SAVENGE é subcontrata pela Nokia para executar vistorias técnicas e instalações de equipamentos e sistemas irradiantes deste projeto nos estados de Pernambuco, Ceará e Paraíba. Neste contexto, a principal atribuição da estagiária era produzir Technical Site Survey Reports (TSSRs) e Relatórios de Instalação das atividades da empresa. Para a produção desses documentos foram utilizados os softwares Microsoft Excel e AutoCAD. |
Abstract: | This report describes the activities developed by the intern at SAVENGE Engenharia LTDA corresponding to her supervised internship in the Telecommunications area, between May 2nd and July 31st of 2017. The student was allocated in the "LTE 700 TIM" project, which refers to the deployment of TIM’s fourth generation mobile systems (4G) at 700MHz. SAVENGE performs technical surveys and equipment installation for Nokia in the states of Pernambuco, Ceará and Paraíba. In this context, the student was responsible for producing Technical Site Reports (TSSRs) and Installation Reports of the company's activities. These documents were produced using Microsoft Excel and AutoCAD softwares. |
Keywords: | Estágio em Engenharia Elétrica SAVENGE - engenharia de Telecomunicações LTDA TIM - Projeto LTE 700 Stage en Génie Electrique SAVENGE - Ingénierie des télécommunications LTDA TIM - Projet LTE 700 Internship in Electrical Engineering SAVENGE - Telecommunications Engineering LTDA TIM - LTE 700 Project |
???metadata.dc.subject.cnpq???: | Engenharia Elétrica. |
URI: | http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20065 |
Appears in Collections: | Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
GABRIELA SOBREIRA DIAS DE CARVALHO - RELATÓRIO DE ESTÁGIO ENG. ELÉTRICA 2017.pdf | Gabriela Sobreira Dias de Carvalho - Relatório de Estágio Eng. Elétrica 2017. | 1.28 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.