Please use this identifier to cite or link to this item:
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20115
Title: | Relatório de estágio integrado. |
Other Titles: | Integrated internship report. |
???metadata.dc.creator???: | SILVESTRE, Pablo Ribeiro. |
???metadata.dc.contributor.advisor1???: | MEIRA, Ubirajara Rocha. |
???metadata.dc.contributor.referee1???: | OLIVEIRA, Leimar de. |
Keywords: | Estágio em Engenharia Elétrica;Energy Eletricidade LTDA;Montagem de instalações elétricas industriais;Manutenção de instalações elétricas industriais;Instalações elétricas industriais;Subestações elétricas;Equipamentos de uma subestação;Relatório diário de obra;Terraplanagem;Sistema de drenagem - construção;Internship in Electrical Engineering;Energy Electricity LTDA;Assembly of industrial electrical installations;Maintenance of industrial electrical installations;Industrial electrical installations;Electrical substations;Substation equipment;Daily work report;Landscaping;Drainage system - construction |
Issue Date: | Mar-2017 |
Publisher: | Universidade Federal de Campina Grande |
Citation: | SILVESTRE, Pablo Ribeiro. Relatório de estágio integrado. 2017. 51f. (Relatório de Estágio Integrado) Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática, Universidade Federal de Campina Grande - Paraíba - Brasil, 2017. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20115 |
???metadata.dc.description.resumo???: | Nesse trabalho são descritas as atividades de estágio integrado realizado pelo graduando Pablo Ribeiro Silvestre na empresa Energy Eletricidade LTDA, a qual fornece serviços de consultoria técnica, elaboração e execução de projetos, montagem e manutenção em instalações industriais, subestações, usinas de geração de energia e linhas de transmissão. O estágio foi realizado na ampliação da subestação Icaraizinho, localizada no distrito de Icaraí, na cidade de Amontada – Ceará. As atividades ocorreram no período de 14 de Novembro de 2016 a 10 de Março de 2017. A obra pertence a CPFL Renováveis, tendo a CPFL Serviços como responsável pela execução, e essa contratou a Energy para a realização. Foram realizadas atividades de planejamento, supervisão, coordenação e execução dos projetos e serviços da obra, em escavação, concretagem, montagens eletromecânicas, lançamento de cabos, gerenciamento e controle do efetivo da obra. |
Abstract: | This work describes the integrated training activities carried out by the graduate Pablo Ribeiro Silvestre in the company Energy Eletricidade LTDA, which provides technical consulting services, design and execution of projects, construction, assembly and maintenance in industrial facilities, electrical power substation and transmission lines. The internship was carried out in the expansion of the Icaraizinho power substation, located in the district of Icaraí, in the city of Amontada - Ceará. The activities took place in the period from November 14, 2016 to March 10, 2017. The work belongs to CPFL Renováveis, and CPFL Serviços is responsible for the execution, which contracted Energy for the construction and assembly. Activities of planning, supervision, coordination and execution of the projects and services of the work were carried out, in excavation, concreting, electromechanical assemblies, cable laying, panel installations, management and control of the workforce. |
Keywords: | Estágio em Engenharia Elétrica Energy Eletricidade LTDA Montagem de instalações elétricas industriais Manutenção de instalações elétricas industriais Instalações elétricas industriais Subestações elétricas Equipamentos de uma subestação Relatório diário de obra Terraplanagem Sistema de drenagem - construção Internship in Electrical Engineering Energy Electricity LTDA Assembly of industrial electrical installations Maintenance of industrial electrical installations Industrial electrical installations Electrical substations Substation equipment Daily work report Landscaping Drainage system - construction |
???metadata.dc.subject.cnpq???: | Engenharia Elétrica. |
URI: | http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20115 |
Appears in Collections: | Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PABLO RIBEIRO SILVESTRE - RELATÓRIO DE ESTÁGIO ENG. ELÉTRICA 2017.pdf | Pablo Ribeiro Silvestre - Relatório de Estágio Eng. Elétrica 2017. | 4.17 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.