Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20289
Title: Relatório final de estágio integrado.
Other Titles: Integrated internship final report.
???metadata.dc.creator???: RODRIGUES, Ana Paula de Lima.
???metadata.dc.contributor.advisor1???: SILVA, Célio Anésio da.
???metadata.dc.contributor.referee1???: ARAÚJO, Jalberth Fernandes de.
Keywords: Estágio em Engenharia Elétrica;Polícia Militar da Paraíba;Projeto elétrico;Projeto luminotécnico;Vistoria técnica;Internship in Electrical Engineering;Paraiba Military Police;Electrical project;Lighting project;Technical inspection
Issue Date: 13-Jul-2018
Publisher: Universidade Federal de Campina Grande
Citation: RODRIGUES, Ana Paula de Lima. Relatório final de estágio integrado. 2018. 126f. (Relatório de Estágio Integrado) Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática, Universidade Federal de Campina Grande - Paraíba - Brasil, 2018. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20289
???metadata.dc.description.resumo???: No relatório estão destacadas as atividades realizadas para o melhoramento das instalações elétricas do 2º Batalhão da Polícia Militar de Campina Grande que é um órgão responsável por manter a ordem pública. Por essa razão, uma instalação elétrica eficiente e segura garantirá a instituição maior qualidade de trabalho e, por conseguinte, excelente desempenho das atividades exercidas dentro do ambiente. as atividades tiveram início em Dezembro de 2017 e foram encerrados em Maio de 2018. Durante esse período a estagiária se utilizou de competências adquiridas no decorrer do curso de graduação em engenharia elétrica para realizar a construção de plantas arquitetônicas, e elaborar projetos elétricos e luminotécnicos.
Abstract: This report highlights the activies carried out for the improvement of the electrical installations of the 2nd Battalion of the Campina Grande Military Police, which is a body responsible for maintaining public order. For this reason, an efficient and safe electrical installation will guarantee the institution higher quality of work and, therefore, excellent performance of the activies carried out within the environment. The activies began in December 2017 and were closed in May 2018. During this period the trainee used the skills acquired during the undergraduate course in electrical engineering to carry out the construction of architectural plans and to design electrical and lighting projects.
Keywords: Estágio em Engenharia Elétrica
Polícia Militar da Paraíba
Projeto elétrico
Projeto luminotécnico
Vistoria técnica
Internship in Electrical Engineering
Paraiba Military Police
Electrical project
Lighting project
Technical inspection
???metadata.dc.subject.cnpq???: Engenharia Elétrica.
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20289
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio

Files in This Item:
File Description SizeFormat 
ANA PAULA DE LIMA RODRIGUES - RELATÓRIO DE ESTÁGIO ENG. ELÉTRICA 2018.pdfAna Paula de Lima Rodrigues - Relatório de Estágio Eng Elétrica 2018.13.19 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.