Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23510
Full metadata record
DC FieldValueLanguage
dc.creator.IDMELO, I. C. C.pt_BR
dc.creator.Latteshttp://lattes.cnpq.br/7826585011867600pt_BR
dc.contributor.advisor1CHAGAS FILHO, Milton Bezerra das.-
dc.contributor.advisor1IDCHAGAS FILHO, M. B.pt_BR
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/7412213914045283pt_BR
dc.contributor.advisor2CHAGAS, Rodrigo Mendes Patrício.-
dc.contributor.advisor2IDCHAGAS, R. M. P.-
dc.contributor.advisor2Latteshttp://lattes.cnpq.br/5977213819094643-
dc.contributor.referee1LIMA, Marco Aurélio de Teixeira e.-
dc.contributor.referee1IDLIMA, M. A. T.pt_BR
dc.contributor.referee1Latteshttp://lattes.cnpq.br/6089461361786115pt_BR
dc.description.resumoProgressivamente, os modelos BIM estão sendo usados para gerar informações de construção, desde cálculos de quantidades, até os processos de fabricação automatizados e simulação de obras. Este último forma a base para seu uso no processo de planejamento, através da adição de tempo ao ambiente do modelo 3D, se torna possível a elaboração de um planejamento 4D. O benefício de usar as informações de “design” para formar a base do programa é que as tarefas de interface e atividades logísticas, bem como as restrições relacionadas à precedência de atividades, podem ser identificadas e comunicadas a todos os níveis da equipe de construção por meio de uma imagem visual baseada no tempo. Este estudo tem como principal finalidade, comprovar que a elaboração do planejamento utilizando a tecnologia BIM 4D, na montagem de uma estrutura metálica, possui significativas vantagens, quando comparado ao modelo tradicional de planejamento, de uma empresa sediada na cidade de Queimadas PB. Para o desenvolvimento da pesquisa foi elaborado um estudo de caso em uma obra executada pela empresa. Foram desenvolvidas onze etapas para a criação de simulações na fase de montagem de estruturas metálicas. Assim como foi analisado como o planejamento 4D poderia ter evitado diversos erros que ocorreram no decorrer da obra. Um “feedback” da empresa que executou a obra também foi obtido, visando buscar opiniões de especialistas no assunto, sobre o método desenvolvido. Ficou evidenciado neste trabalho que o BIM 4D não substitui os conceitos tradicionais de planejamento, mas complementa-os com novas ferramentas de análise, garantindo um processo para extração de informações mais precisas e confiáveis.pt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentCentro de Tecnologia e Recursos Naturais - CTRNpt_BR
dc.publisher.initialsUFCGpt_BR
dc.subject.cnpqEngenharia Civilpt_BR
dc.titleSimulação da montagem de estruturas metálicas por meio da aplicação do BIM 4D.pt_BR
dc.date.issued2018-
dc.description.abstractProgressively, BIM models are being used to generate construction information, from quantity surveys to automated manufacturing processes and construction simulation. The latter create the basis for its use in the planning process, by adding the variable “time” to the 3D model environment, becoming possible to elaborate a 4D planning. The benefit of using design information to form the basis of the program is that the interface tasks and logistical activities, as well as constraints related to the precedence of activities, can be identified and communicated to the entire construction team through a visual image based on time. The main purpose of this study is to prove that the use of BIM 4D technology in the assembly of a steel structure has significant advantages when compared to the traditional planning routine of a company based in the city of Queimadas PB. For the development of the research, a case study was elaborated in a construction executed by the company. Eleven steps were developed to create simulations in the assembly phase of steel structures. Also, it was analyzed how the 4D planning could have avoided several mistakes that occurred during the real situation. A feedback from the company that executed the work was also obtained, aiming to seek the opinions of experts on the subject, about the method. It was evidenced in this paper that the BIM 4D does not substitute traditional planning concepts, but complements it with new analysis tools, guaranteeing more accurate and reliable informations for the planning process.pt_BR
dc.identifier.urihttp://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23510-
dc.date.accessioned2022-02-14T12:55:45Z-
dc.date.available2022-02-14-
dc.date.available2022-02-14T12:55:45Z-
dc.typeTrabalho de Conclusão de Cursopt_BR
dc.subjectEstruturas metálicaspt_BR
dc.subjectMontagem de estruturas metálicaspt_BR
dc.subjectBIM 4Dpt_BR
dc.subjectSimulação de estruturas metálicaspt_BR
dc.subjectPlanejamento de obraspt_BR
dc.subjectModelos BIMpt_BR
dc.subjectBuilding Information Modelling - BIMpt_BR
dc.subjectMetallic structurespt_BR
dc.subjectAssembly of metal structurespt_BR
dc.subjectSimulation of metallic structurespt_BR
dc.subjectConstruction planningpt_BR
dc.subjectBIM modelspt_BR
dc.rightsAcesso Abertopt_BR
dc.creatorMELO, Igor Cariry Cabral de.-
dc.publisherUniversidade Federal de Campina Grandept_BR
dc.languageporpt_BR
dc.title.alternativeSimulation of the assembly of metallic structures through the application of BIM 4D.pt_BR
dc.identifier.citationMELO, Igor Cariry Cabral de. Simulação da montagem de estruturas metálicas por meio da aplicação do BIM 4D. 2018. 65f. Trabalho de Conclusão de Curso (Monografia), Curso de Bacharelado em Engenharia Civil, Centro de Tecnologia e Recursos Naturais, Universidade Federal de Campina Grande - Campina Grande - Paraíba - Brasil, 2018. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23510pt_BR
Appears in Collections:Curso de Bacharelado em Engenharia Civil - CTRN - Monografias

Files in This Item:
File Description SizeFormat 
IGOR CARIRY CABRAL DE MELO - TCC ENG. CIVIL CTRN 2018.pdf Igor Cariry Cabral de Melo - TCC ENG. CIVIL CTRN 20182.8 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.