Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/24970
Title: Filosofia just in time na construção civil: estudo de caso em um edifício de Campina Grande - PB.
Other Titles: Just in time philosophy in civil construction: a case study in a building in Campina Grande - PB.
???metadata.dc.creator???: SANTOS, Itamar Ferreira.
???metadata.dc.contributor.advisor1???: VASCONCELOS, Ana Cecília Feitosa de.
???metadata.dc.contributor.referee1???: SANTOS, Joselito.
???metadata.dc.contributor.referee2???: MARTINS, Maria de Fátima.
Keywords: Construção Civil;Método Just in time;Processos produtivos;Estudo de caso;Construction;Just in time method;Productive processes;Case study
Issue Date: 5-Oct-2021
Publisher: Universidade Federal de Campina Grande
Citation: SANTOS, Itamar Ferreira. Filosofia just in time na construção civil: estudo de caso em um edifício de Campina Grande - PB. 2021. 27f. (Trabalho de Conclusão de Curso - Artigo), Curso de Administração, Centro de Humanidades, Universidade Federal de Campina Grande - Paraíba - Brasil, 2021. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/24970
???metadata.dc.description.resumo???: O Just in time é um método de racionalização dos processos produtivos, focado na eficiência, ao definir, de maneira racional e sistemática, a cadeia produtiva. O seu emprego auxilia na gestão e tomada de decisão, desde a concepção do projeto à definição de layout racional do canteiro de obras, além do planejamento ordenado das equipes, polivalência dos trabalhadores, melhoria e aperfeiçoamento dos processos de compra, produção e transporte na execução da obra. Todavia, nem todos os setores a incorporaram com deveriam. Nesse rol está o setor da construção civil, onde há déficit de modernização relativo a métodos produtivos comprovados e eficazes, o que resulta na perda de vantagens competitivas. Nesta perspectiva, este trabalho tem como objetivo analisar a aplicabilidade do Just in time em edificação de uma empresa de pequeno porte no município de Campina Grande - PB. Para tanto, foi feita uma pesquisa descritiva, de campo, com abordagem qualitativa tipo estudo de caso, com aplicação de instrumento com questões tipo escala Likert, adaptado de Cunha (2009), que estudou a aplicabilidade do sistema Lean Construction na indústria da construção civil em Petrolina - PE. Participaram do estudo cinco respondentes dos níveis estratégico e tático, que responderam a um questionário composto por perguntas com cinco possibilidades de respostas distribuídas entre zero e quatro, onde zero indica que o princípio não está presente e quatro indica que o princípio está efetivamente implantado. Os resultados indicam que a empresa ainda não tem implantado o JIT. Seu uso não ocorre de maneira consciente e sistêmica pela gestão da empresa, cujos gestores tem expertise para a prática construtiva, não têm embasamento teórico para definir as atividades, modelos e padrões do processo produtivo.
Abstract: Just in time is a methodo frationalizing production processes, focused on efficiency, by defining, in a rational and systematic way, the production chain. Its use helps in management and decisionmaking, from project design to the definition of a rational layout of the construction site, in addition to the orderly planning of teams, versatility of workers, improvement and improvement of the purchase, production and transport processes in the execution of the work. However, not all sectors have incorporated it as they should. In this list is the civil construction sector, where there is a déficit of modernization related to proven and efficient production methods, which results in the loss of competitive advantages. In this perspective, this work aims to analyze the applicability of Just in time in building a small business in the city of Campina Grande - PB. Therefore, a descriptive Field research was carried out with a qualitative case study approach, with the application of na instrument with Likert scale questions, adapted from Cunha (2009), Who studied the applicability of the Lean Construction system in the construction industry in Petrolina - PE. Five respondents from the strategic and tactical levels participated in the study, Who answered a questionnaire consisting of questions with Five possible answers distributed between zero and four, where zero indicates that the principle is not present and four indicates that the principle is effectively implemented. The results indicate that the company hás not implemented JIT yet. Its use does not occur in a conscious and systemic way by the company's management, whose managers have expertise for the constructive practice, they have no theoretical basis to define the activities, models and standards of the production process.
Keywords: Construção Civil
Método Just in time
Processos produtivos
Estudo de caso
Construction
Just in time method
Productive processes
Case study
???metadata.dc.subject.cnpq???: Administração
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/24970
Appears in Collections:Curso de Bacharelado em Administração - CH - Artigos

Files in This Item:
File Description SizeFormat 
ITAMAR FERREIRA SANTOS - TCC ARTIGO ADMINISTRAÇÃO CH 2021.pdfItamar Ferreira Santos - TCC Artigo Administração CH 2021321.2 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.