Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/25426
Title: Impactos da pandemia de covid-19 no orçamento de obras públicas: comparativo entre reajuste e reequilíbrio de contratos.
Other Titles: Impacts of the covid-19 pandemic on the public works budget: comparison between readjustment and rebalancing of contracts.
???metadata.dc.creator???: ARAÚJO JÚNIOR, Gildenor Pires de.
???metadata.dc.contributor.advisor1???: ROCHA, Elis Gean.
???metadata.dc.contributor.advisor2???: SOUZA, Thyago Lima.
???metadata.dc.contributor.referee1???: SILVA FILHO, Rivaildo da.
???metadata.dc.contributor.referee2???: SOARES, Antonio Leomar Ferreira.
Keywords: INCC;Reequilíbrio econômico-financeiro;Serviços;Insumos;Economic-financial rebalancing;Services;Inputs;Orçamento de obras públicas - impacto da COVID-19;Contratos - obras públicas;Construção Civil - impacto COVID-19;Sítio Flores - Pombal - PB - Unidade Básica de Saúde
Issue Date: 31-Mar-2022
Publisher: Universidade Federal de Campina Grande
Citation: ARAÚJO FILHO, Gildenor Pires de. Impactos da pandemia de covid-19 no orçamento de obras públicas: comparativo entre reajuste e reequilíbrio de contratos. 2022. 85 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Centro de Ciências e Tecnologia Agroalimentar, Universidade Federal de Campina Grande, Pombal, Paraíba, Brasil, 2022.
???metadata.dc.description.resumo???: Com a chegada da pandemia do Corona Vírus Disease - 2019 (Covid-19), um período de calamidade pública foi instaurado na sociedade brasileira, iniciado no ano de 2020, e os impactos foram imensuráveis em todos os setores da economia, inclusive na construção civil. Diante disso, esse estudo realizado na Unidade Básica de Saúde no sítio flores, situado no município de Pombal-PB, tem como objetivo elaborar o reequilíbrio econômico-financeiro do contrato de uma obra pública e comparar com o reajuste pelo índice de inflação, de modo a analisar o impacto da alta nos preços dos serviços e insumos. O orçamento inicial possui a grandeza de R$ 657.272,95 sem a presença do BDI, mas com a realização da curva ABC foi possível destacar os itens mais onerosos da planilha presentes na faixa A, correspondendo ao valor de R$ 528.226,06. Dessa forma, foi mantida a separação do orçamento original por etapas de serviços de engenharia e realizado dois procedimentos, o reajuste acumulado (anual) pelo Índice Nacional da Construção Civil (INCC) no valor de 17,35% e o reequilíbrio dos preços unitários do período de 06/2020 para 07/2021. A partir dos resultados apresentados, o aumento do reajuste pelo INCC foi de R$ 91.647,22 e o do reequilíbrio foi de R$ 111.304,91. Comparando os dois métodos executados, encontramos uma diferença significativa no aumento dos preços. Dos 11 serviços que englobam a faixa A, apenas 5 apresentaram percentual de crescimento menor que o aplicado no reajuste. Comparando com os 17,35% que é previsto pela inflação, as etapas de instalações hidráulicas e esquadrias alcançaram mais que o dobro desse valor com os resultados de 36,39% e 35,06%, respectivamente. Dessa forma, o reajuste pelo INCC não foi capaz de justificar o aumento na maioria das etapas, justificando, assim, a necessidade d da revisão dos preços para manter a viabilidade do contrato.
Abstract: With the arrival of the Corona Virus Disease - 2019 (Covid-19) pandemic, a period of public calamity was introduced in Brazilian society, beginning in the year 2020, and the impacts were immeasurable in all sectors of the economy, including in construction. Therefore, this study carried out in the Basic Unit of Health at the Flores site, located in the municipality of Pombal-PB, aims to prepare the economic-financial rebalancing of the contract for a public work and compare with the readjustment by the inflation index, in order to analyze the impact of the rise in the prices of services and inputs. The initial budget has the magnitude of R$ 657,272.95 without the presence of the BDI, but with the realization of the ABC curve, it was possible to highlight the most expensive items in the worksheet present in range A, corresponding to the amount of R$ 528,226.06. In this way, the separation of the original budget by stages of engineering services and carried out two procedures, the accumulated (annual) adjustment by the National Construction Index (INCC) in the amount of 17.35% and the rebalancing of unit prices for the period of 06/2020 to 07/2021. Based on the results presented, the increase in the readjustment by the INCC was R$91,647.22 and the rebalancing was R$111,304.91. Comparing the two methods performed, we found a significant difference in price increases. Of the 11 services that encompass band A, only 5 showed a lower percentage of growth than that applied in the readjustment. Comparing with the 17.35% that is predicted by inflation, the installation stages hydraulics and frames reached more than double this value with the results of 36.39% and 35.06%, respectively. In this way, the readjustment by the INCC was not able to justify the increase in most steps, justifying, thus, the need to review prices to maintain the viability of the contract.
Keywords: INCC
Reequilíbrio econômico-financeiro
Serviços
Insumos
Economic-financial rebalancing
Services
Inputs
Orçamento de obras públicas - impacto da COVID-19
Contratos - obras públicas
Construção Civil - impacto COVID-19
Sítio Flores - Pombal - PB - Unidade Básica de Saúde
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/25426
Appears in Collections:Curso de Bacharelado em Engenharia Civil - CCTA

Files in This Item:
File Description SizeFormat 
TCC - Gildenor Pires de Araújo Junior.pdfGILDENOR PIRES DE ARAÚJO JUNIOR - TCC - ENGENHARIA CIVIL- 2022.2.04 MBAdobe PDFView/Open
TCC - Gildenor Pires de Araújo Junior - lançado na BDTD.pdf1.43 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.