Title: Estudo de incremento de potência da pequena central hidrelétrica Usina Curemas, Coremas-PB.
Other Titles: Study of power increment of the small hydroelectric plant Usina Curemas, Coremas-PB.
???metadata.dc.creator???: MATOS, Brenda Stephanie de Oliveira.
???metadata.dc.contributor.advisor1???: CHAGAS, Rodrigo Mendes Patrício.
???metadata.dc.contributor.referee1???: RIBEIRO, Rosinete Batista dos Santos.
???metadata.dc.contributor.referee2???: REGO, Janiro Costa.
Keywords: Usina hidrelétrica;Hydroelectric plant;Pequena Central Hidrelétrica - PCH - Repotencialização;Small Hydroelectric Power Plant - SHP - Repowering;Açude Estevam Marinho;Estevam Marinho Reservoir
Issue Date: 26-Aug-2022
Publisher: Universidade Federal de Campina Grande
Citation: MATOS, Brenda Stephanie de Oliveira. Estudo de incremento de potência da pequena central hidrelétrica Usina Curemas, Coremas-PB. 2022. 72 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Centro de Ciências e Tecnologia Agroalimentar, Universidade Federal de Campina Grande, Pombal, Paraíba, Brasil, 2022.
???metadata.dc.description.resumo???: Sabe-se que os investimentos em reformas de centrais hidrelétricas são inviáveis visando sob a ótica socioambiental, deste modo a repotenciação foi criada no intuito de aumentar a energia gerada pelas turbinas de usinas antigas. Para a PCH, a repotenciação é vista como uma forma mais sustentável de desenvolvimento promovendo maior rendimento e ganhos na potência, além de ter valor inferior ao de uma construção. Com base nisso, foi desenvolvida esta pesquisa tendo como principais objetivos o aumento da potência das turbinas da PCH Usina Curemas e o alcance de 4,1 MW de potência gerada para abastecer o município de Coremas, utilizando quatro formas de repotenciação sendo elas: substituição das turbinas existentes por outras do mesmo tipo mais modernos que obteve como resultado um aumento de 301, 53 kW comparada a turbina Francis antiga, substituição das turbinas existentes por outras de outro tipo onde o incremento foi de 83,23 kW, alteamento da barragem do reservatório obtendo um ganho de 140 kW comparada com a turbina antiga, e melhoria da turbina instalada utilizando outra vazão de projeto, sendo esta vazão de 1,3 m³/s, o resultado obtido foi de 1.418,50 kW a menos que a turbina antiga. Deste modo foi concluído que o estudo teve resultados positivos para três tipos de repotenciação e um resultado negativo, ficando bem inferior a potência instalada atualmente na Usina Curemas. Por fim, conclui-se que somente um tipo era viável para a solucionar o problema por atingir a necessidade de potência que o municíoi de Coremas necessita.
Abstract: It is known that investments in hydroelectric power plant renovations are unfeasible from a socio-environmental point of view, so the repowering was created in order to increase the energy generated by the turbines of old plants. For the PCH, repowering is seen as a more sustainable form of development, promoting greater performance and power gains, in addition to having a lower value than a construction. Based on this, this research was developed with the main objectives of increasing the power of the turbines of the SHP Usina Curemas and reaching 4.1 MW of generated power to supply the municipality of Coremas, using four forms of repowering, namely: replacement of existing turbines for more modern ones of the same type, which resulted in an increase of 301.53 kW compared to the old Francis turbine, replacement of the existing turbines by others of another type where the increase was 83.23 kW, heightening of the reservoir dam obtaining a gain of 140 kW compared to the old turbine, and improvement of the turbine installed using another design flow, this flow being 1.3 m³/s, the result obtained was 1,418.50 kW less than the old turbine. Thus, it was concluded that the study had positive results for three types of repowering and a negative result, being much lower than the power currently installed at the Curemas Plant. Finally, it is concluded that only one type was viable to solve the problem by reaching the need for power that the municipality of Coremas needs.
Keywords: Usina hidrelétrica
Hydroelectric plant
Pequena Central Hidrelétrica - PCH - Repotencialização
Small Hydroelectric Power Plant - SHP - Repowering
Açude Estevam Marinho
Estevam Marinho Reservoir
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/26925
Appears in Collections:Curso de Bacharelado em Engenharia Civil - CCTA

Files in This Item:
File Description SizeFormat 
BRENDA STEPHANIE DE OLIVEIRA MATOS – TCC – ENGENHARIA CIVIL - 2022.pdfBrenda Stephanie de Oliveira Matos – TCC – Engenharia Civil - 2022.3.09 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.