Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/27981
Full metadata record
DC FieldValueLanguage
dc.creator.IDCONSERVA, J. C. V.pt_BR
dc.creator.Latteshttp://lattes.cnpq.br/2385020474247048pt_BR
dc.contributor.advisor1SILVA, Yuri Laio Teixeira Veras.-
dc.contributor.advisor1IDSILVA, Y. L. T. V.pt_BR
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/8971490719107438pt_BR
dc.contributor.referee1LIMA JÚNIOR, Josean da Silva.-
dc.contributor.referee1IDLIMA JÚNIOR, J. S.pt_BR
dc.contributor.referee1Latteshttp://lattes.cnpq.br/9926427437369371pt_BR
dc.contributor.referee2FARIAS, Luana Marques Sousa.-
dc.contributor.referee2IDFARIAS, L. M. S.pt_BR
dc.identifier.doihttps://dx.doi.org/10.52446/cursoengpoducaoCDSA.2022.tccmon.conserva-
dc.description.resumoO Job-Shop Scheduling (JSS) é um problema de otimização que envolve processos decisórios a respeito da ordem em que pedidos de produção devem ser executados em um determinado conjunto de máquinas e etapas. Esse problema é bastante conhecido e vem recebendo grande atenção da literatura nos últimos anos. Diante disso, este trabalho tem como objetivos realizar um estudo acerca de uma variante do JSS, chamado de Job-Shop Scheduling com minimização de custos por antecipação e atraso (JSS-ETC) e propor algoritmos eficientes para sua resolução. No JSS-ETC é considerado os custos e adversidades operacionais causadas pela antecipação e atraso que ocorre quando existe a imprecisão da programação da produção, buscando-se a adoção da filosofia Just-in-Time. Nesta pesquisa, são apresentadas duas metaheurísticas baseadas em Algoritmo Genético e Busca Local. Os experimentos computacionais apresentados atestam a efetividade dos algoritmos propostos por meio da realização de benchmark com algoritmos presentes na literatura.pt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentCentro de Desenvolvimento Sustentável do Semiárido - CDSApt_BR
dc.publisher.initialsUFCGpt_BR
dc.subject.cnpqEngenharia de Produçãopt_BR
dc.titleAbordagem metaheurística híbrida para minimização de custos por antecipação e atrasos na produção.pt_BR
dc.date.issued2022-10-20-
dc.description.abstractJob-Shop Scheduling (JSS) is an optimization problem that involves decision processes regarding the order in which production orders should be executed in a given set of machines and steps. This problem is well known and has received great attention in the literature in recent years. Therefore, this work aims to carry out a study about a variant of JSS, called Job-Shop Scheduling with minimization of costs by earliness and tardiness (JSS-ETC) and to propose efficient algorithms for its resolution. In JSS-ETC, costs and operational adversities caused by earliness and tardiness that occur when there is inaccuracy in the production schedule are considered, seeking to adopt the Just-in-Time philosophy. In this research, two metaheuristics based on Genetic Algorithm and Local Search are presented. The computational experiments presented attest to the effectiveness of the proposed algorithms by performing a benchmark with algorithms found in the literature.pt_BR
dc.identifier.urihttp://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/27981-
dc.date.accessioned2022-11-22T12:51:54Z-
dc.date.available2022-11-22-
dc.date.available2022-11-22T12:51:54Z-
dc.typeTrabalho de Conclusão de Cursopt_BR
dc.subjectJob-Shop Schedulingpt_BR
dc.subjectCustos por antecipação e atrasopt_BR
dc.subjectEarly and late costs.pt_BR
dc.subjectAlgoritmo genéticopt_BR
dc.subjectGenetic algorithmpt_BR
dc.subjectMinimização de custospt_BR
dc.subjectMinimization of costspt_BR
dc.subjectSequenciamento da produçãopt_BR
dc.subjectProduction sequencingpt_BR
dc.subjectBenchmarkpt_BR
dc.subjectAbordagem metaheurística híbrida – Engenharia de Produçãopt_BR
dc.subjectHybrid metaheuristic approach – Production Engineeringpt_BR
dc.rightsAcesso Abertopt_BR
dc.creatorCONSERVA, Júlio Cesar Vasconcelos.-
dc.publisherUniversidade Federal de Campina Grandept_BR
dc.languageporpt_BR
dc.title.alternativeEnfoque metaheurístico híbrido para minimizar costos por anticipación y retrasos en la producción.pt_BR
dc.identifier.citationCONSERVA, Júlio Cesar Vasconcelos. Abordagem metaheurística híbrida para minimização de custos por antecipação e atrasos na produção. 2022. 51f. (Trabalho de Conclusão de Curso – Monografia), Curso de Engenharia de Produção, Centro de Desenvolvimento Sustentável do Semiárido, Universidade Federal de Campina Grande, Sumé – Paraíba – Brasil, 2021. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/27981pt_BR
Appears in Collections:Curso de Bacharelado em Engenharia de Produção - CDSA - Monografias

Files in This Item:
File Description SizeFormat 
JULIO CESAR VASCONCELOS CONSERVA - TCC ENG. DE PRODUÇÃO CDSA 2022.pdfJúlio Cesar Vasconcelos Conserva - TCC Eng. de Produção CDSA 20221.4 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.