Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/31133
Full metadata record
DC FieldValueLanguage
dc.contributor.advisor1ANDRADE, Suelen Silva Figueiredo.-
dc.contributor.advisor1IDFIGUEIREDO, S. S.pt_BR
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/6976651417711520pt_BR
dc.contributor.advisor-co1MEDEIROS, Eduardo Morais de.-
dc.contributor.advisor-co1IDMEDEIROS, E. M.pt_BR
dc.contributor.advisor-co1Latteshttp://lattes.cnpq.br/7696115928204611pt_BR
dc.contributor.referee1BATISTA, Larissa Santana.-
dc.contributor.referee2NASCIMENTO, Raquel Ferreira do.-
dc.description.resumoPara se ter um bom planejamento e gerenciamento de obras, são necessários vários projetos completos e bem detalhados, que servirão para a realização de consultas e análises feitas pelos responsáveis pelo gerenciamento e execução dos serviços. Com o projeto orçamentário não é diferente, pois é peça fundamental do planejamento de qualquer tipo de obra. Neste trabalho foi elaborado um projeto orçamentário de manutenção predial da residência feminina da UFCG/CCTA, o qual é distribuído em várias etapas. Iniciando pela visita ao prédio onde foi realizado o levantamento dos problemas encontrados e dos serviços necessários para manutenção, após isso foi realizado o quantitativo desses serviços e de todo o material necessário à manutenção. De posse dessas informações e números, segue-se para a pesquisa de preços de cada material e serviço, que foi consultado pelos sistemas estaduais e nacional de pesquisa de custos e índices da construção civil. Com as quantidades e com os custos, elaborou-se a planilha de orçamento, a qual foi separada por categorias, detalhando cada material e serviço, contendo sua quantidade, unidade de medida, preço unitário, preço total e código da pesquisa. Por fim foi elaborado o cronograma físico-financeiro, que será responsável por fazer a relação de custo e tempo gasto em cada serviço. O custo total do projeto de orçamento ficou em R$ 113.916,97 e conta com um prazo de execução de todos os serviços estimado em 6 meses. Serão projetos importantes para os responsáveis pelo planejamento e execução dos serviços de manutenção, garantindo a diminuição dos desperdícios, a eficiência da obra e a otimização do tempo.pt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentCentro de Ciências e Tecnologia Agroalimentar - CCTApt_BR
dc.publisher.initialsUFCGpt_BR
dc.subject.cnpqEngenharia Civil.pt_BR
dc.titleElaboração de planilha orçamentária para manutenção predial da residência universitária feminina da UFCG/CCTA.pt_BR
dc.date.issued2023-07-12-
dc.description.abstractIn order to have good planning and management of works, several complete and well-detailed projects are necessary, which will serve to carry out consultations and analyses carried out by those responsible for the management and execution of the services. It is no different from the budget project, as it is a fundamental part of planning any type of work. In this work, a budgetary project for building maintenance of the women's residence of UFCG/CCTA will be elaborated, which will be distributed in several stages. Starting with the visit to the building where the survey of the problems found and the services necessary for maintenance will be carried out, after that the quantitative of these services and all the materials necessary for maintenance will be carried out. With this information and numbers in hand, we proceed to research the prices of each material and service, which will be consulted by the state and national cost research systems and civil construction indexes. The budget worksheet is prepared with the quantities and costs, which will be separated by categories, detailing each material and service, containing its quantity, unit of measure, unit price, total price and research code. Finally, the physical-financial schedule will be drawn up, which will be responsible for making the cost and time spent on each service. These will be important projects for those responsible for planning and executing maintenance services, ensuring the reduction of waste, work efficiency, and time optimization.pt_BR
dc.identifier.urihttp://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/31133-
dc.date.accessioned2023-08-01T13:55:29Z-
dc.date.available2023-08-01-
dc.date.available2023-08-01T13:55:29Z-
dc.typeTrabalho de Conclusão de Cursopt_BR
dc.subjectConstrução civilpt_BR
dc.subjectConstructionpt_BR
dc.subjectEngenharia de custospt_BR
dc.subjectCost engineeringpt_BR
dc.subjectManutenção Predialpt_BR
dc.subjectBuilding maintenancept_BR
dc.subjectLevantamento quantitativopt_BR
dc.subjectQuantitative surveypt_BR
dc.subjectPlanilha orçamentáriapt_BR
dc.subjectBudget spreadsheetpt_BR
dc.subjectCronograma físico-financeiropt_BR
dc.subjectFinancial physical schedulept_BR
dc.rightsAcesso Abertopt_BR
dc.creatorOLIVEIRA, Emerson Nunes de.-
dc.publisherUniversidade Federal de Campina Grandept_BR
dc.languageporpt_BR
dc.title.alternativeElaboration of a budget spreadsheet for building maintenance of the UFCG/CCTA female university residence.pt_BR
dc.identifier.citationOLIVEIRA, Emerson Nunes de. Elaboração de planilha orçamentária para manutenção predial da residência universitária feminina da UFCG/CCTA. 2023. 80 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Centro de Ciências e Tecnologia Agroalimentar, Universidade Federal de Campina Grande, Pombal, Paraíba, Brasil, 2023.pt_BR
Appears in Collections:Curso de Bacharelado em Engenharia Civil - CCTA

Files in This Item:
File Description SizeFormat 
EMERSON NUNES DE OLIVEIRA - TCC -ENGENHARIA CIVIL 2023.pdfEmerson Nunes de Oliveira– TCC – Engenharia Civil 2023.3.09 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.