Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/37127
Title: Relatório de Estágio Supervisionado - Hospital Universitário Alcides Carneiro (HUAC).
Other Titles: Supervised Internship Report - Alcides Carneiro University Hospital (HUAC).
???metadata.dc.creator???: SOUSA, Gustavo Rodrigues de.
???metadata.dc.contributor.advisor1???: VILAR, Pablo Bezerra.
???metadata.dc.contributor.referee1???: SIQUEIRA, Roberto Silva de.
Keywords: Mapeamento de Instalações Elétricas;Elaboração de Projetos Elétricos;Modificações de Projetos Elétricos;Mapping of Electrical Installations;Elaboration of Electrical Projects;Modifications to Electrical Projects
Issue Date: 7-Jun-2024
Publisher: Universidade Federal de Campina Grande
Citation: SOUSA, Gustavo Rodrigues de. Relatório de Estágio Supervisionado - Hospital Universitário Alcides Carneiro (HUAC). 2024. 17 f. Relatório (Bacharelado em Engenharia Elétrica) - Universidade Federal de Campina Grande, Centro de Engenharia Elétrica e Informática, Campina Grande, Paraíba, Brasil, 2024.
???metadata.dc.description.resumo???: O presente trabalho faz referência ao estágio curricular desenvolvido pelo aluno Gustavo Rodrigues de Sousa do curso de graduação de Engenharia Elétrica da Universidade Federal de Campina Grande (UFCG) no Hospital Universitário Alcides Carneiro (HUAC), da rede EBSERH, de 19 de fevereiro de 2024 a 14 de maio de 2024, com carga horária de 30 horas semanais, sendo 15 horas presenciais e 15 horas no formato home office, totalizando uma carga horária de 360 horas. Durante o período de estágio o aluno participou na elaboração de projetos elétricos para novas instalações e ampliações, realizou o mapeamento de instalações elétricas antigas em determinados blocos do hospital que necessitam de modernização (retrofit) e acompanhou a execução de obras, garantindo o cumprimento de prazos e padrões de qualidade. O estágio foi realizado no setor de infraestrutura do HUAC e teve a supervisão do engenheiro eletricista Emanoel Leite da Silva e orientação do professor Pablo Bezerra Vilar.
Abstract: This work refers to the curricular internship developed by the student Gustavo Rodrigues de Sousa of the Electrical Engineering undergraduate course of the Federal University of Campina Grande (UFCG) at the Alcides Carneiro University Hospital (HUAC), part of the EBSERH network, from February 19, 2024 to May 14, 2024, with a workload of 30 hours per week, 15 hours in person and 15 hours in the home office format, totaling a workload of 360 hours. During the internship period, the student participated in the preparation of electrical projects for new installations and expansions, mapped old electrical installations in certain blocks of the hospital that require modernization (retrofit) and monitored the execution of works, ensuring compliance with deadlines and quality standards. The internship was carried out in the infrastructure sector of HUAC and was supervised by electrical engineer Emanoel Leite da Silva and advised by professor Pablo Bezerra Vilar.
Keywords: Mapeamento de Instalações Elétricas
Elaboração de Projetos Elétricos
Modificações de Projetos Elétricos
Mapping of Electrical Installations
Elaboration of Electrical Projects
Modifications to Electrical Projects
???metadata.dc.subject.cnpq???: Engenharia Elétrica
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/37127
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio

Files in This Item:
File Description SizeFormat 
GUSTAVO RODRIGUES DE SOUSA-RELATÓRIO DE ESTÁGIO-CEEI-ENGENHARIA ELÉTRICA (2024).pdf610.94 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.