Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/37191
Title: Relatório de Estágio Integrado: ECOMAN – Engenharia, Construção e Manutenção LTDA.
Other Titles: Integrated Internship Report: ECOMAN – Engineering, Construction and Maintenance LTDA.
???metadata.dc.creator???: GALINDO, Luan Fábio Marinho.
???metadata.dc.contributor.advisor1???: BRAGA FILHO, Edgar Roosevelt.
???metadata.dc.contributor.referee1???: SILVA, Célio Anésio da.
Keywords: ECOMAN;COELBA;Construção de Linhas de Transmissão;Engenharia Elétrica;Transmission Line Construction;Electrical Engineering
Issue Date: 5-Jun-2024
Publisher: Universidade Federal de Campina Grande
Citation: GALINDO, Luan Fábio Marinho. Relatório de Estágio Integrado: ECOMAN – Engenharia, Construção E Manutenção LTDA. 58 f. Relatório de Estágio (Bacharelado em Engenharia Elétrica) - Universidade Federal de Campina Grande, Centro de Engenharia Elétrica e Informática, Campina Grande, Paraí-ba, Brasil, 2024. Disponível em:
???metadata.dc.description.resumo???: Neste relatório descrevem-se as principais atividades do período de Estágio Integrado em Engenharia Elétrica de Luan Fábio Marinho Galindo, na empresa ECOMAN – Engenharia, Construção e Manutenção LTDA, pelo setor de Construção e Manutenção de Linhas de Transmissão, atuando na obra LD 138 kV Alto Fêmeas II – Mundo Verde (Lote 1), solicitada pela Companhia de Eletricidade do Estado da Bahia (COELBA) na cidade de São Desidério, Bahia, com carga horária total de 669h. O texto aborda as ati-vidades realizadas pelo estagiário, partindo da fundamentação em normas no setor de construção de linhas de transmissão até o acompanhamento de atividades tanto em cam-po quanto no escritório que incluem, mas não se limitam a: locação de estruturas, esca-vação, concretagem, aterramento, pré-montagem, içamento, lançamento de condutores e grampeamento dos cabos, finalizando com indagações sobre a experiência de estágio, sobre como a formação na UFCG contribuiu para o estágio e com conclusões técnicas sobre a obra. O estágio ocorreu sob supervisão dos engenheiros Jorge Luiz Batista Leal e Hericles Rodrigues Ferreira e sob orientação do professor Edgar Roosevelt Braga Filho, D. Sc.
Abstract: This report describes the main activities of the Integrated Internship period of Luan Fá-bio Marinho Galindo, at the company ECOMAN – Engenharia, Construção e Manuten-ção LTDA, in the Construction and Maintenance of Transmission Lines sector, working on the LD 138 kV Alto Fêmeas II – Mundo project Verde (Lot 1), requested by the Electricity Company of the State of Bahia (COELBA) in the city of São Desidério, Bahia, with a total workload of 669h. The text addresses the activities carried out by the intern, starting from the basis of standards in the transmission line construction sector to monitoring activities both in the field and in the office which include, but are not limited to: tenantry of structures,excavation, concreting, grounding, pre-assembly, lifting, laying of conductors and clamping of cables, ending with inquiries about the internship experience, how graduating at UFCG contributed to the internship and with technical conclusions about the work. The internship took place under the supervision of engineers Jorge Luiz Batista Leal and Hericles Rodrigues Ferreira and under the guidance of Professor Edgar Roosevelt Braga Filho, D. Sc.
Keywords: ECOMAN
COELBA
Construção de Linhas de Transmissão
Engenharia Elétrica
Transmission Line Construction
Electrical Engineering
???metadata.dc.subject.cnpq???: Engenharia Elétrica
URI: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/37191
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio

Files in This Item:
File Description SizeFormat 
LUAN FÁBIO MARINHO GALINDO-RELATÓRIO DE ESTÁGIO-CEEI-ENGENHARIA ELÉTRICA (2024).pdf3.65 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.