Please use this identifier to cite or link to this item:
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/5490
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.creator.ID | FERREIRA, L. L. | pt_BR |
dc.creator.Lattes | http://lattes.cnpq.br/4062847014642530 | pt_BR |
dc.contributor.advisor1 | BARBOSA, Robson Fernandes. | - |
dc.contributor.advisor1ID | BARBOSA, R. F. | pt_BR |
dc.contributor.advisor1Lattes | http://lattes.cnpq.br/5329317234568143 | pt_BR |
dc.contributor.referee1 | QUEIROZ, Suelyn Fabiana Aciole Morais de. | - |
dc.contributor.referee2 | SANTOS, Antonio Carlos de Queiroz. | - |
dc.identifier.doi | https://dx.doi.org/10.52446/cursoengpoducaoCDSA.2016.tccmon.ferreira | - |
dc.description.resumo | Em busca por competitividade e produtividade para a sobrevivência das empresas no mercado global, surge a crescente preocupação com a redução de desperdícios, sendo estes relacionados ao tempo de produção, a ociosidade máquinas ou a materiais. A fabricação de mangueiras de PVC, mais especificamente, junto ao processo de extrusão. Esse processo de fabricação é composto de diversas etapas, iniciando-se pela mistura da matéria prima, passando pelos processos de extrusão, calibração, resfriamento, corte, acabamento e finalizando pela pesagem e dimensionamento das mangueiras. Também se tornou possível a aplicação estratégias que possibilitou melhorias no processo trazendo como consequência uma economia significativa para a empresa com a diminuição do índice de refugo na produção de mangueiras de PVC. As mudanças de comportamento observadas incluem um melhor comprometimento em relação ao trabalho a ser executado, fruto dos treinamentos realizados durante a implementação e a disciplina com relação à sequencia e prazos de cumprimento de cada tarefa da preparação de máquina, melhoria esta obtida com a padronização das tarefas. O setup é o tempo que se leva na troca de ferramentas para preparar um equipamento, entre a última peça de boa qualidade produzida e a primeira peça aprovada do novo produto. O referente trabalho objetiva a redução do tempo de setup em um processo de extrusão de PVC, visando reduzir os desperdícios e reorganizar os temos de paradas de máquinas. Apesar da redução de tempo obtida no experimento em questão, é possível reduzir ainda mais os tempos de preparação, através da redução de cada uma das operações de preparação de máquina para atingir este objetivo foi feita analise dos tempos e da filmagem do setup nas extrusoras. Dessa forma o pesquisador empregou a aplicação de ferramentas que auxilia nessa busca para a redução desses desperdícios gerados. Baseando-se nos conceitos de Produção Enxuta, foi realizada a avaliação do estado corrente do processo, e foi reduzido significativamente o tempo de setup, onde assim pode-se constar a eficiência da ferramenta com uma redução de tempo de troca de ferramentas, além do amplo aprendizado ao pesquisador e a organização. | pt_BR |
dc.publisher.country | Brasil | pt_BR |
dc.publisher.department | Centro de Desenvolvimento Sustentável do Semiárido - CDSA | pt_BR |
dc.publisher.initials | UFCG | pt_BR |
dc.title | Implantação de melhorias para a redução dos tempos de Setup dos processos produtivos com o intuito de reduzir e/ou eliminar desperdícios. | pt_BR |
dc.date.issued | 2016-09-30 | - |
dc.description.abstract | In search for competitiveness and productivity for the survival of businesses in the global market, there is the growing concern over the reduction of waste, which are related to the production time, idle machines or materials. The manufacture of PVC hose, more specifically, by the extrusion process. This manufacturing process consists of several steps, starting by mixing the raw material passing through the extrusion, calibration, cooling, cutting, finishing and finishing by weighing and dimensioning of the hose. It also made possible the implementation of process improvements bring results in a significant savings for the company by reducing the scrap rate in production of PVC hoses. behavioral changes observed include better commitment in relation to the work to be performed, the result of training conducted during implementation and discipline regarding the sequence and deadlines for implementation of each task machine preparation, improvement as obtained with the standardization of tasks. The setup is the time it takes to exchange tools to prepare equipment, between the last piece of good quality and produced the first piece approved the new product. The work aims to reduce the setup time in a process of PVC extrusion, to reduce waste and rearrange have machines stops. Despite the reduction of time obtained in the experiment in question, it is possible to further reduce setup times by reducing each of the machine preparation operations to achieve this goal was made analysis of setup times and shooting setup in extruders. Thus the researcher used the application tool that helps in this quest to reduce these waste generated. Based on the concepts of lean production, assessment of the current state of the process was carried out, and was significantly improved setup time generating, which thus can be included in the tool efficiency with a reduction in time of tool change, in addition the broad learning the researcher and the organization. | pt_BR |
dc.identifier.uri | http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/5490 | - |
dc.date.accessioned | 2019-08-07T11:30:01Z | - |
dc.date.available | 2019-08-07 | - |
dc.date.available | 2019-08-07T11:30:01Z | - |
dc.type | Trabalho de Conclusão de Curso | pt_BR |
dc.subject | Planejamento da produção | pt_BR |
dc.subject | Controle de qualidade | pt_BR |
dc.subject | Eficiência | pt_BR |
dc.subject | Production planning | pt_BR |
dc.subject | Quality control | pt_BR |
dc.subject | Efficiency | pt_BR |
dc.rights | Acesso Aberto | pt_BR |
dc.creator | FERREIRA, Luzia de Lira. | - |
dc.publisher | Universidade Federal de Campina Grande | pt_BR |
dc.language | por | pt_BR |
dc.title.alternative | Implementation of improvements to reduce the setup times of production processes in order to reduce and / or eliminate waste. | pt_BR |
dc.identifier.citation | FERREIRA, Luzia de Lira. Implantação de melhorias para a redução dos tempos de Setup dos processos produtivos com o intuito de reduzir e/ou eliminar desperdícios. 2016. 73f. (Trabalho de Conclusão de Curso – Monografia), Curso de Engenharia de Produção, Centro de Desenvolvimento Sustentável do Semiárido, Universidade Federal de Campina Grande, Sumé – Paraíba – Brasil, 2016. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/5490 | pt_BR |
Appears in Collections: | Curso de Bacharelado em Engenharia de Produção - CDSA - Monografias |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
LUZIA DE LIRA FERREIRA - TCC ENG. DE PRODUÇÃO CDSA 2016..pdf | Luzia de Lira Ferreira - TCC Eng. de Produção CDSA 2016. | 1 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.