DSpace/Manakin Repository

Proposta de um modelo de planejamento e controle de execução para usina piloto no campus CCTA/UFCG na cidade de Pombal-PB.

Mostrar registro simples

dc.creator.ID PEREIRA, D. S. O. pt_BR
dc.creator.Lattes http://lattes.cnpq.br/8409655904436214 pt_BR
dc.contributor.advisor1 SILVA, Elisângela Pereira da.
dc.contributor.advisor1ID SILVA, E. P. pt_BR
dc.contributor.advisor1Lattes http://lattes.cnpq.br/7427231236185885 pt_BR
dc.contributor.referee1 MEDEIROS, Fernanda Karolline de.
dc.contributor.referee2 MEDEIROS, Eduardo Morais de.
dc.contributor.referee3 FRANÇA, Yghor Sulpino.
dc.description.resumo A construção civil ainda sofre com a ausência de planejamento e controle de suas obras, especificamente, em obras de pequeno e médio porte em que o controle dos prazos das atividades é feito de maneira informal. Esse é um desafio do setor que vem buscando introduzir com eficácia um sistema de programação dentro das empresas. Dessa forma, o presente trabalho tem por objetivo propor um modelo de planejamento e controle que possa servir para aplicação em empresas de pequeno e médio porte. O método de pesquisa utilizado foi a pesquisa-ação, realizada em uma obra pública de médio porte na cidade de Pombal-PB. O planejamento foi subdividido em níveis hierárquicos a longo, médio e curto prazo, com o intuito de aumentar o controle dos prazos das atividades. Houve desafios na implantação do modelo por ter sido implementado com a obra em andamento. Mesmo havendo variação nos resultados do Percentual de Planejamento Concluído (PPC), o valor médio foi igual a 79,56%, indicando que a programação foi eficaz. A utilização do indicador de desempenho da programação semanal, permitiu uma melhor percepção em relação ao controle dos serviços, além disso, facilitou na visualização das principais causas que impediram o cumprimento das metas. A partir da análise dos indicadores gerados é possível observar uma variação entre o planejamento e a execução na prática. Porém, trata-se de um processo com melhoria contínua, pois trata de uma metodologia que envolve uma mudança cultural da empresa. pt_BR
dc.publisher.country Brasil pt_BR
dc.publisher.department Centro de Ciências e Tecnologia Agroalimentar - CCTA pt_BR
dc.publisher.initials UFCG pt_BR
dc.subject.cnpq Engenharia Civil. pt_BR
dc.title Proposta de um modelo de planejamento e controle de execução para usina piloto no campus CCTA/UFCG na cidade de Pombal-PB. pt_BR
dc.date.issued 2019-11-21
dc.description.abstract Civil construction still suffers from the lack of planning and control of its works, specifically in small and medium-sized works where the control of the deadlines of activities is done informally. This is an industry challenge that has been seeking to effectively introduce a programming system within companies. Thus, the present work aims to propose a planning and control model that can be used for small and medium size companies. The research method used was action research, carried out in a medium-sized public work in the city of Pombal-PB. The planning was subdivided into long, medium and short term hierarchical levels, in order to increase the control of the activity deadlines. There were challenges in the implementation of the model because it was implemented with the work in progress. Even with variation in the PPC results, the average value was equal to 79.56%, indicating that the programming was effective. The use of the programming performance indicator, allowed a better perception regarding the control of services, besides facilitating the visualization of the main causes that prevented the accomplishment of the goals. From the analysis of the generated indicators it is possible to observe a variation between the planning and the execution in practice. However, it is a process with continuous improvement, because it is a methodology that involves a cultural change of the company. pt_BR
dc.identifier.uri http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/10711
dc.date.accessioned 2020-01-07T09:32:57Z
dc.date.available 2020-01-07
dc.date.available 2020-01-07T09:32:57Z
dc.type Trabalho de Conclusão de Curso pt_BR
dc.subject Construção civil pt_BR
dc.subject Construction pt_BR
dc.subject Planejamento de obra pt_BR
dc.subject Construction planning pt_BR
dc.subject Controle de obra pt_BR
dc.subject Construction control pt_BR
dc.subject Planejamento pt_BR
dc.subject Planning pt_BR
dc.subject Níveis hierárquicos pt_BR
dc.subject Hierarchical levels pt_BR
dc.subject Programação semanal pt_BR
dc.subject Programming pt_BR
dc.rights Acesso Aberto pt_BR
dc.creator PEREIRA, Daniel Silas Oliveira.
dc.publisher Universidade Federal de Campina Grande pt_BR
dc.language por pt_BR
dc.title.alternative Proposal of a planning and execution control model for pilot plant at CCTA / UFCG campus in Pombal-PB. pt_BR
dc.identifier.citation PEREIRA. Daniel Silas Oliveira. Proposta de um modelo de planejamento e controle de execução para usina piloto no campus CCTA/UFCG na cidade de Pombal-PB. 2019. 96 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Centro de Ciências e Tecnologia Agroalimentar, Universidade Federal de Campina Grande, Pombal, Paraíba, Brasil, 2019. pt_BR


Arquivos deste item

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples

Buscar DSpace


Busca avançada

Navegar

Minha conta