Aplicação do FMEA como suporte para melhoria de processos na construção civil: um estudo de caso.

Mostrar registro simples

dc.creator.Lattes http://lattes.cnpq.br/9761915184906246 pt_BR
dc.contributor.advisor1 ARAÚJO, Maria Creuza Borges de.
dc.contributor.advisor1ID ARAÚJO, M. C. B. pt_BR
dc.contributor.advisor1Lattes : http://lattes.cnpq.br/8314910448343996 pt_BR
dc.contributor.referee1 BRAGA, Alexandra Chaves.
dc.contributor.referee2 CUNHA, John Elton de Brito Leite.
dc.identifier.doi https://dx.doi.org/10.52446/cursoengpoducaoCDSA.2019.tccmon.silva2
dc.description.resumo O setor da construção civil é um dos motores da economia brasileira e movimenta bilhões todos os anos. Dentro desse contexto de relevância estratégica e econômica, a qualidade e segurança das obras é um fator essencial para a solidez dessa indústria e permite com que as obras desempenhem seu papel da melhor forma possível. Levando isso em conta, a área da manutenção industrial é um domínio do conhecimento que usa ferramentas variadas para identificar e prevenir e/ou mitigar possíveis falhas em equipamentos, incluindo, em sentido amplo, as próprias edificações. Nesse cerne, o Failure Mode and Effect Analysis (FMEA), "Análise de Modos de Falhas e Efeitos", é um método utilizado para prevenir falhar e analisar os riscos decorrentes dessa falha, sendo aplicável a vários processos de diversas áreas. Este estudo objetivou desenvolver um plano de melhoria com base no FMEA para uma obra de construção civil localizada na cidade de São José do Egito-PE. Em primeiro lugar, foram elencadas as atividades realizadas no canteiro de obras, sendo aplicado posteriormente o FMEA para o ambiente específico. Por fim, com base no resultado da aplicação do FMEA, foram identificados os modos de falha com maior Número de Prioridade de Risco (NPR). Os 5 modos de falha com maior NPR, para os quais foi proposto um plano de melhoria foram: deterioração das vigas, compartimentos de placas de drywall inadequados, quebra da pedra cerâmica, posicionamento de vigas inadequado e infiltrações. Os 3 primeiros são da etapa estrutural, ao passo que o quarto é de projeto e o último é da etapa de instalações hidráulicas. A aplicação do formulário FMEA foi capaz de identificar os modos de falha com maior NPR e, a partir disso, elaborar um plano de melhoria para aumentar a eficiência do processo de trabalho no ambiente estudado. pt_BR
dc.publisher.country Brasil pt_BR
dc.publisher.department Centro de Desenvolvimento Sustentável do Semiárido - CDSA pt_BR
dc.publisher.initials UFCG pt_BR
dc.title Aplicação do FMEA como suporte para melhoria de processos na construção civil: um estudo de caso. pt_BR
dc.date.issued 2019-12-12
dc.description.abstract The civil construction sector is one of the key drivers of Brazilian economy and moves billions a year. In this context of strategic and economic relevance, quality and safety of construction sites is an essential factor for the soundness of this industry and allows constructions to perform at their best. Taking this into consideration, industrial maintenance is a domain of knowledge that uses a variety of tools in order to identify and prevent and/or mitigate eventual faults in equipment, including, in a broad sense, the building themselves. In this regard, Failure Mode and Effect Analysis (FMEA) is a method designed to prevent potential failure and analyze risks derived from it, and is applicable to many processes in several different fields. This study aimed to develop an FMEA-based improvement plan for a construction site located in the city of São José do Egito-PE. In the first place, activities carried out at the construction site were listed, and FMEA was then applied to the specific environment. At last, based on the result of FMEA application, failure modes with the highest Risk Priority Number (NPR) were identified. The 5 failure modes with highest NPR for which an improvement plan was proposed were: beam deterioration, inadequate beam utilization, inadequate drywall board compartments, ceramic stone breakage and infiltration. The first 4 are from the structural stage, whereas the last one is from the hydraulic installation stage. The application of FMEA form was able to identify failure modes with highest NPR and, from this, elaborate an improvement plan in order to increase work process efficiency in the studied environment. pt_BR
dc.identifier.uri http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/17091
dc.date.accessioned 2021-01-21T09:56:40Z
dc.date.available 2021-01-21
dc.date.available 2021-01-21T09:56:40Z
dc.type Trabalho de Conclusão de Curso pt_BR
dc.subject FMEA - Failure Mode and Effect Analysis pt_BR
dc.subject Manutenção industrial pt_BR
dc.subject Construção civil pt_BR
dc.subject Edificação pt_BR
dc.subject Análise de falhas – construções pt_BR
dc.subject Industrial maintenence pt_BR
dc.subject Construction pt_BR
dc.subject Edification pt_BR
dc.subject Failure analysis - constructions pt_BR
dc.rights Acesso Aberto pt_BR
dc.creator SILVA, Débora Luana Henrique Soares.
dc.publisher Universidade Federal de Campina Grande pt_BR
dc.language por pt_BR
dc.title.alternative Application of FMEA as a support for process improvement in civil construction: a case study. pt_BR
dc.identifier.citation SILVA, Débora Luana Henrique Soares. Aplicação do FMEA como suporte para melhoria de processos na construção civil: um estudo de caso. 52f. 2019. (Trabalho de Conclusão de Curso – Monografia), Curso de Engenharia de Produção, Centro de Desenvolvimento Sustentável do Semiárido, Universidade Federal de Campina Grande, Sumé – Paraíba – Brasil, 2019. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/17091 pt_BR