dc.creator.ID |
NASCIMENTO, D. M. |
pt_BR |
dc.creator.Lattes |
http://lattes.cnpq.br/2135070779191598 |
pt_BR |
dc.contributor.advisor1 |
SILVA, Célio Anésio da. |
|
dc.contributor.advisor1ID |
SILVA, C. A. |
pt_BR |
dc.contributor.advisor1Lattes |
http://lattes.cnpq.br/6105337488345986 |
pt_BR |
dc.contributor.referee1 |
ARAÚJO, Jalberth Fernandes de. |
|
dc.contributor.referee1ID |
ARAÚJO, J. F. |
pt_BR |
dc.description.resumo |
Neste trabalho é abordado o estudo de caso das instalações elétricas da Unidade de Terapia
Intensiva do Real Hospital Português de Beneficência em Pernambuco (RHP), local do Grupo
2 dos Estabelecimentos Assistenciais de Saúde (EAS). Os equipamentos e as instalações
elétricas que são utilizados nestes ambientes devem receber energia de qualidade devido às
exigências de confiabilidade e segurança que estes estabelecimentos devem oferecer. Para
garantir o fornecimento de energia ininterrupta, exigência de locais como Unidades de Terapia
Intensiva (UTI) e Centros Cirúrgicos, por exemplo, devem ser alimentados pelo esquema de
aterramento Sistema IT Médico. Este trabalho traz, de maneira clara e sucinta, o que especifica
as normas NBR 13534, NBR 5410 e a RDC nº 50ª, além da aplicação destas normas na UTI do
Real Hospital Português, local do grupo 2, objeto de estudo deste trabalho. Foi possível concluir
que é importante que se tenha um projeto elétrico obedecendo às normas vigentes para este tipo
de instalação. E também é primordial a integração entre as áreas da Engenharia Clínica,
Engenharia Elétrica e o Corpo Médico para conseguir satisfazer as demandas que os EAS
exigem. Além de que se deve investir mais recursos nestas instalações e principalmente no
Sistema IT Médico para evitar acidentes aos pacientes e corpo clínico, garantindo a segurança
e confiabilidade no fornecimento de energia elétrica para os ambientes do grupo 2. |
pt_BR |
dc.publisher.country |
Brasil |
pt_BR |
dc.publisher.department |
Centro de Engenharia Elétrica e Informática - CEEI |
pt_BR |
dc.publisher.initials |
UFCG |
pt_BR |
dc.subject.cnpq |
Engenharia Elétrica. |
pt_BR |
dc.title |
Estudo de caso das instalações elétricas da Unidade Terapia Intensiva do Real Hospital Português . |
pt_BR |
dc.date.issued |
2020-11-23 |
|
dc.description.abstract |
This work deals with the case study of the electrical installations of the Intensive Care Unit of
the Real Hospital Português de Beneficência in Pernambuco (RHP), site of Group 2 of Health
Care Establishments (EAS). The equipment and electrical installations that are used in these
environments must receive quality energy due to the requirements of reliability and safety that
these establishments must offer. To guarantee the supply of uninterrupted energy, the
requirement of places such as Intensive Care Units (ICUs) and Surgical Centers, for example,
must be powered by the Medical IT System grounding scheme. This work brings, in a clear and
succinct way, what specifies the standards NBR 13534, NBR 5410 and RDC nº 50ª, in addition
to the application of these standards in the ICU of Real Hospital Português, site of group 2,
object of study of this work. It was possible to conclude that it is important to have an electrical
project complying with the current regulations for this type of installation. And it is also
essential to integrate the areas of Clinical Engineering, Electrical Engineering and the Medical
Staff in order to be able to satisfy the demands that EAS require. In addition, more resources
should be invested in these facilities and especially in the Medical IT System to prevent
accidents to patients and the medical staff, ensuring safety and reliability in the supply of
electrical energy for the group 2 environments. |
pt_BR |
dc.identifier.uri |
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/19119 |
|
dc.date.accessioned |
2021-05-28T20:27:22Z |
|
dc.date.available |
2021-05-28 |
|
dc.date.available |
2021-05-28T20:27:22Z |
|
dc.type |
Trabalho de Conclusão de Curso |
pt_BR |
dc.subject |
Instalações elétricas hospitalares |
pt_BR |
dc.subject |
Hospital -instalações elétricas |
pt_BR |
dc.subject |
Hospital Real Português - instalações elétricas |
pt_BR |
dc.subject |
Proteção elétrica do paciente |
pt_BR |
dc.subject |
Equipamento eletromédico |
pt_BR |
dc.subject |
Hospital electrical installations |
pt_BR |
dc.subject |
Hospital - electrical installations |
pt_BR |
dc.subject |
Hospital Real Português - electrical installations |
pt_BR |
dc.subject |
Electrical patient protection |
pt_BR |
dc.subject |
Electromedical equipment |
pt_BR |
dc.rights |
Acesso Aberto |
pt_BR |
dc.creator |
NASCIMENTO, Diogo Marques. |
|
dc.publisher |
Universidade Federal de Campina Grande |
pt_BR |
dc.language |
por |
pt_BR |
dc.title.alternative |
Case study of the electrical installations of the Intensive Care Unit of the Real Hospital Português. |
pt_BR |
dc.identifier.citation |
NASCIMENTO, Diogo Marques. Estudo de caso das instalações elétricas da Unidade Terapia Intensiva do Real Hospital Português. 2020. 58f. (Trabalho de Conclusão de Curso - Monografia), Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática , Universidade Federal de Campina Grande – Paraíba - Brasil, 2020. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/19119 |
pt_BR |