SÁ, F. R. F.; http://lattes.cnpq.br/4009726399017458; SÁ, Filipe Rafael Farias de.
Resumo:
This report describes what has been developed during the mandatory traineeship,
whose workload was 240 hours, occurred in the UFCG. It is described the activities
developed and the results obtained during working time. The traineeship was basically
to create an electrical design for the Pilot Plant, which will be built on the campus of
UFCG in Pombal. For this was necessary knowledge of various standards, whose main
parts used are described later in this text. Beyond this more theoretical part, were
developed floor plans, memorials, diagrams and tables, featuring more practical
activities, which also shows the results throughout the text.