GONÇALVES, W. E. F.; http://lattes.cnpq.br/0866188856101930; GONÇALVES, Walber Emmanuel Freire.
Abstract:
This work shows how activities developed during the Supervised the
Company Duraplast Indústria de Injetados Termoplásticos LTDA , located in Campina
Grande - PB, during the period 20 April 2015 to 30 June 2015, totaling 180 hours.
Initially Basics About Some Energy efficiency. In Then described are like activities
carried out in Stage Period , They Being , lifting loads of Power , custodian Survey no
kW/h of the Machines, Analysis of Power Quality , preventive maintenance schedule
Survey , Monitoring the Maintenance and Cleaning Substation and Improvement
Project in the Electric factory System.