SOARES, L. J.; http://lattes.cnpq.br/1353060568926255; SOARES, Leonardo Jordão.
Résumé:
The supervised internship is part of the curriculum of the course of Electrical
Engineering at the Federal University of Campina Grande. The stage was held in
Barcelona Engenharia company that develops projects, maintenance, construction and
reform. The internship program supervised started on December 14, 2015 and was
completed on February 5, 2016, totaling 308 hours. Was held the power project of low
commercial power voltage and stabilized the agency Caixa Econômica Federal located
in the building, consisting of the planning of lighting and emergency lighting points ,
making for each environment , circuit division, raising the installed load and
development of new distribution boards . In addition, a relocation of the study of
existing fixtures in place and also the relocation of distribution boards was carried out.
The stage activities consisted initially in the existing Technical Standards studies
dealing with projects of building electrical installations and supply of electricity. The
following steps consisted of the analysis and implementation of the building wiring
design agency Caixa Econômica Federal located in Graham Bell Building, Street Sport
Club do Recife, ilha do leite, Recife.