MENDONÇA, Y. M.; http://lattes.cnpq.br/7714762299759391; MENDONÇA, Yasmin de Morais.
Abstract:
This report presents the activities of the supervised training held in University
Hall (PU) of the Federal University of Campina Grande (UFCG). The internship
constitutes the preparation of a project of building electrical installation of Biology and
Chemistry Laboratory, to be located on the campus of Cajazeiras -PB. The electrical
design was based on the requirements of the NBR 5410:2004 standards, NBR ISO / CIE
8995-1:2003 and the NDU-001 Energisa. As methodological tools software AutoCAD,
DIALux and spreadsheets were used for the preparation of the project, which satisfied
the proposed objectives.