NOLE, Á. B.; http://lattes.cnpq.br/3646912479872484; NOLE, Áquila Borba.
Résumé:
The purpose of this report is to describe, in a summarized way, the knowledge acquired,
as well as the activities carried out during the supervised internship at the company
Energy Eletricidade Ltda, a company in the field of design and execution of electrical
projects. The internship period was comprised between January 1, 2017 and April 13,
2017. The activities carried out by the trainee focused on the participation of the
implementation of two main projects: the medium voltage aerial network that
interconnects the wind generators of the newly built Vila Acre I & Vila Acre II wind
power plants to a pre-existing substation, as well as the execution of the 230 kV
transmission line responsible for the connection between the 34.5 / 230 kV substation of
the Santo In cio Wind Complex and the Mossor IV substation. They met all the
requirements and objectives proposed.