This document, presented in the form of a report, describes in a sequential manner
the main activities carried out by the graduates of the company Energy Eletricidade
LTDA, corresponding to the student stage, given during the months of April to August of
the current year (03/04/2017-31/08/2017), in an integrated form, in the municipality of
Lagoa Nova, state of Rio Grande do Norte, with emphasis on the electrotechnical area,
particularly with regard to the transmission of energy. The works carried out and
supported by the construction site of works installed in that locality, related to the
construction of a transmission line, according to a voltage level of sixty-nine kilovolts (69
KV) to be connected to the power system of the concession, from the generation of the
wind farms of Pedra Rajada I, II and III. In addition, based on standardized
documentation, as well as standards and specifications of procedures and materials
associated with power transmission circuits, tasks related to project planning and control,
leasing of transmission structures, as well as cable laying and related electromechanical
assemblies as a way to meet specific and specific demands on the previously planned
interconnection process.