dc.creator.ID |
MORAES, V. S. |
pt_BR |
dc.creator.Lattes |
http://lattes.cnpq.br/1525818155121850 |
pt_BR |
dc.contributor.advisor1 |
BRAGA FILHO, Edgar Roosevelt. |
|
dc.contributor.advisor1ID |
BRAGA FILHO, E. R. |
pt_BR |
dc.contributor.advisor1Lattes |
http://lattes.cnpq.br/5260464346220327 |
pt_BR |
dc.contributor.referee1 |
OLIVEIRA, Leimar de. |
|
dc.contributor.referee1ID |
OLIVEIRA, L. |
pt_BR |
dc.description.resumo |
Este documento, apresentado sob a forma de relatório, descreve de maneira
sequencial as principais atividades desenvolvidas pelo graduando junto à empresa Energy
Eletricidade LTDA, correspondente ao estágio discente, prestado durante os meses de
abril a de agosto do ano em curso (03/04/2017-31/08/2017), sob forma integrada, no
município de Lagoa Nova, estado do Rio Grande do Norte, com ênfase na área de
eletrotécnica, particularmente no tocante à transmissão de energia. Os trabalhos levados
a efeito e suportado pelo canteiro de obras instalado naquela localidade, disseram respeito
à construção de uma linha de transmissão, segundo um nível de tensão de sessenta e nove
quilovolts (69 KV) a ser interligada ao sistema de potência da concessão, a partir da
geração dos parques eólicos de Pedra Rajada I, II e III. Outrossim, e fundamentadas em
documentação normatizada, bem como, padrões e especificações de procedimentos e
materiais associados aos circuitos de transmissão de energia, foram desenvolvidas tarefas
vinculadas ao planejamento e controle de projetos, locação de estruturas de transmissão,
bem como, lançamento de cabos e montagens eletromecânicas afins, como forma de
atender demandas próprias e específicas ao processo de interligação anteriormente
planejado. Vale salientar que os objetivos foram atingidos satisfatoriamente. |
pt_BR |
dc.publisher.country |
Brasil |
pt_BR |
dc.publisher.department |
Centro de Engenharia Elétrica e Informática - CEEI |
pt_BR |
dc.publisher.initials |
UFCG |
pt_BR |
dc.subject.cnpq |
Engenharia Elétrica. |
pt_BR |
dc.title |
Energy Eletricidade. |
pt_BR |
dc.date.issued |
2017 |
|
dc.description.abstract |
This document, presented in the form of a report, describes in a sequential manner
the main activities carried out by the graduates of the company Energy Eletricidade
LTDA, corresponding to the student stage, given during the months of April to August of
the current year (03/04/2017-31/08/2017), in an integrated form, in the municipality of
Lagoa Nova, state of Rio Grande do Norte, with emphasis on the electrotechnical area,
particularly with regard to the transmission of energy. The works carried out and
supported by the construction site of works installed in that locality, related to the
construction of a transmission line, according to a voltage level of sixty-nine kilovolts (69
KV) to be connected to the power system of the concession, from the generation of the
wind farms of Pedra Rajada I, II and III. In addition, based on standardized
documentation, as well as standards and specifications of procedures and materials
associated with power transmission circuits, tasks related to project planning and control,
leasing of transmission structures, as well as cable laying and related electromechanical
assemblies as a way to meet specific and specific demands on the previously planned
interconnection process. |
pt_BR |
dc.identifier.uri |
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20145 |
|
dc.date.accessioned |
2021-07-20T18:10:51Z |
|
dc.date.available |
2021-07-20 |
|
dc.date.available |
2021-07-20T18:10:51Z |
|
dc.type |
Trabalho de Conclusão de Curso |
pt_BR |
dc.subject |
Estágio em Engenharia Elétrica |
pt_BR |
dc.subject |
Energy Eletricidade LTDA |
pt_BR |
dc.subject |
Parque eólico |
pt_BR |
dc.subject |
Linha de transmissão |
pt_BR |
dc.subject |
Estrutura de alta tensão |
pt_BR |
dc.subject |
Parques Eólicos Pedra Rajada I, II e III |
pt_BR |
dc.subject |
Cálculo elétrico e mecânico |
pt_BR |
dc.subject |
Fundações |
pt_BR |
dc.subject |
Escavações |
pt_BR |
dc.subject |
Internship in Electrical Engineering |
pt_BR |
dc.subject |
Energy Electricity LTDA |
pt_BR |
dc.subject |
Wind farm |
pt_BR |
dc.subject |
Transmission line |
pt_BR |
dc.subject |
High voltage structure |
pt_BR |
dc.subject |
Pedra Rajada I, II and III Wind Farms |
pt_BR |
dc.subject |
Electrical and Mechanical Calculation |
pt_BR |
dc.subject |
Foundations |
pt_BR |
dc.subject |
Excavations |
pt_BR |
dc.rights |
Acesso Aberto |
pt_BR |
dc.creator |
MORAES, Vinicius Siqueira. |
|
dc.publisher |
Universidade Federal de Campina Grande |
pt_BR |
dc.language |
por |
pt_BR |
dc.title.alternative |
Energy Electricity. |
pt_BR |
dc.identifier.citation |
MORAES, Vinicius Siqueira. Energy Eletricidade. 2017. 73f. (Relatório de Estágio Integrado) Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática, Universidade Federal de Campina Grande - Paraíba - Brasil, 2017. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20145 |
pt_BR |