dc.creator.ID |
HENRIQUES JÚNIOR, J. L. |
pt_BR |
dc.contributor.advisor1 |
PEREIRA, Fernanda Raquel Roberto. |
|
dc.contributor.advisor1ID |
PEREIRA, F. R. R. |
pt_BR |
dc.contributor.advisor1Lattes |
http://lattes.cnpq.br/6865151397795312 |
pt_BR |
dc.contributor.advisor-co1 |
SANTOS, Fernanda Ferreira. |
|
dc.contributor.advisor-co1ID |
SANTOS, F. F. |
pt_BR |
dc.contributor.referee1 |
SOUSA, Jackson Epaminondas de. |
|
dc.contributor.referee1ID |
SOUSA, J. E |
pt_BR |
dc.contributor.referee2 |
LIMA JÚNIOR, Josean da Silva. |
|
dc.contributor.referee2ID |
LIMA JÚNIOR, J. S. |
pt_BR |
dc.identifier.doi |
https://dx.doi.org/10.52446/cursoengpoducaoCDSA.2021.tccmon.henriquesjunior |
|
dc.description.resumo |
No Brasil, diariamente, são noticiados casos de incêndios nos mais diversos tipos de
edificações, os quais são responsáveis por grandes desastres e perdas tanto de bens materiais
quanto de vidas. O país é foco de grandes tragédias causadas por incêndios, para evitá-los
alguns cuidados são necessários, os quais muitas vezes são negligenciados. Para tanto, existem
normas e órgãos fiscalizadores que regularizam questões voltadas a incêndio, como a norma
regulamentadora (NR) 23 que estabelece diretrizes necessárias para a prevenção e combate a
incêndios em edificações. A partir da NR23
é possível desenvolver um plano de ação adequado
para cada tipo de edificação, atendendo as suas necessidades e prioridades. Tal plano é
indispensável, principalmente, em ambientes com grande circulação de pessoas. Dentre vários
ambientes com essas características as unidades hospitalares, são espaços onde pessoas
transitam no local 24 horas por dia, desde profissionais a pacientes. Diante dessa necessidade o
estudo tem como objetivo desenvolver um sistema de proteção contra incêndio em uma unidade
hospitalar, localizado na cidade de Serra Branca – PB, bem como a proposição de melhorias e
adequações baseado no que rege a NR – 23 e a Norma Técnica 06 vigente pelo Corpo de
Bombeiros da Paraíba (CBMPB). A metodologia deu-se
através de um estudo de caso, com
visitas in loco, com o intuito de analisar os riscos voltados a questões de incêndio, identificação
das inconformidades e, por fim, o desenvolvimento do plano de emergência final. Como
resultado da pesquisa, identificou-se
várias irregularidades, como por exemplo: ausência de
rotas de fuga, falta de sinalizações e dimensionamentos dos extintores incorretos. A partir disso,
o plano de ação foi desenvolvido de acordo com as necessidades do ambiente e baseado na
classificação da edificação segundo as normas do CBMPB. |
pt_BR |
dc.publisher.country |
Brasil |
pt_BR |
dc.publisher.department |
Centro de Desenvolvimento Sustentável do Semiárido - CDSA |
pt_BR |
dc.publisher.initials |
UFCG |
pt_BR |
dc.title |
Desenvolvimento de um sistema de proteção contra incêndio em uma unidade hospitalar. |
pt_BR |
dc.date.issued |
2021-10-26 |
|
dc.description.abstract |
In Brazil, cases of fires are reported daily in the most diverse types of buildings, which are
responsible for major disasters and losses of both material goods and lives. The country is the
focus of great tragedies caused by fires, to avoid them, some cares are necessary, which are
often neglected. To this end, there are standards and inspection bodies that regularize firerelated
issues. The regulatory standard (NR) 23 establishes the necessary guidelines for the
prevention and combating of fires in buildings, its application must happen correctly so that it
is possible to fight and avoid fire situations. Based on NR23,
it is possible to develop an
appropriate action plan for each type of building, meeting your needs and priorities. Such a plan
is essential for environments with a large number of people in transit, such as hospitals. It is
known that in hospital units there are numerous devices, which require different sources of
power. In addition, a large number of people transit the place 24 hours a day, from professionals
to patients, hence the need to develop a study and suggest improvements for such a location.
So, after observing the needs that environments of this nature present, a study was developed
based on what governs NR – 23, this study was divided into six stages, which were: initial visit
to the location, conversation with managers, preliminary analysis of the location, identification
of nonconformities,
preparation of the proposed solution in the site plan and, finally, the
conclusion of the final emergency plan, which was delivered to the hospital managers in
question. The action plan was developed according to the needs of the environment and based
on the classification of the building according to the CBMPB standards, where the need to
assess and adjust issues such as emergency exits, emergency signage and building fire
extinguishers was identified. Therefore, this work aims to develop a fire protection system in a
hospital located in the city of Serra Branca PB,
as well as the proposition of improvements
and adjustments based on what governs the NR – 23 and the technical standards of the Military
Fire Department of Paraíba (CBMPB). |
pt_BR |
dc.identifier.uri |
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/22090 |
|
dc.date.accessioned |
2021-11-23T17:53:48Z |
|
dc.date.available |
2021-11-23 |
|
dc.date.available |
2021-11-23T17:53:48Z |
|
dc.type |
Trabalho de Conclusão de Curso |
pt_BR |
dc.subject |
Segurança do trabalho |
pt_BR |
dc.subject |
Incêndio - prevenção |
pt_BR |
dc.subject |
Norma Regulamentadora |
pt_BR |
dc.subject |
Ambiente hospitalar – proteção contra incêndio |
pt_BR |
dc.subject |
Plano de ação – proteção contra incêndio |
pt_BR |
dc.subject |
Extintores de incêndio |
pt_BR |
dc.subject |
Sinalização de emergência |
pt_BR |
dc.subject |
Fogo – incêndio em ambiente hospitalar - proteção |
pt_BR |
dc.subject |
Workplace safety |
pt_BR |
dc.subject |
Fire - prevention |
pt_BR |
dc.subject |
Regulatory standard |
pt_BR |
dc.subject |
Hospital environment - fire protection |
pt_BR |
dc.subject |
Action plan - fire protection |
pt_BR |
dc.subject |
Fire extinguishers |
pt_BR |
dc.subject |
Emergency signaling |
pt_BR |
dc.subject |
Fire - fire in a hospital environment - protection |
pt_BR |
dc.rights |
Acesso Aberto |
pt_BR |
dc.creator |
HENRIQUES JÚNIOR, José de Lima. |
|
dc.publisher |
Universidade Federal de Campina Grande |
pt_BR |
dc.language |
por |
pt_BR |
dc.title.alternative |
Development of a fire protection system in a hospital unit. |
pt_BR |
dc.identifier.citation |
HENRIQUES JÚNIOR, José de Lima. Desenvolvimento de um sistema de proteção contra incêndio em uma unidade hospitalar. 2021. 53f. (Trabalho de Conclusão de Curso – Monografia), Curso de Engenharia de Produção, Centro de Desenvolvimento Sustentável do Semiárido, Universidade Federal de Campina Grande, Sumé – Paraíba – Brasil, 2021. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/22090 |
pt_BR |