DSpace/Manakin Repository

Análise dos índices de produtividade de mão de obra no serviço de armação em estruturas de concreto armado - lajes, vigas e pilares.

Mostrar registro simples

dc.creator.ID ARAÚJO, W. T. pt_BR
dc.creator.Lattes http://lattes.cnpq.br/3902491246933236 pt_BR
dc.contributor.advisor1 FERNANDES, Macel Wallace Queiroz.
dc.contributor.advisor1ID FERNANDES, M. W. Q. pt_BR
dc.contributor.advisor1Lattes http://lattes.cnpq.br/4214801635506443 pt_BR
dc.contributor.referee1 SOUZA, Ádney José Duarte de.
dc.contributor.referee1ID SOUZA, A. J. D. pt_BR
dc.contributor.referee1Lattes http://lattes.cnpq.br/9737013758835206 pt_BR
dc.contributor.referee2 SIMPLÍCIO, Marcos Antônio de Souza.
dc.contributor.referee2ID SIMPLÍCIO, M. A.S. pt_BR
dc.contributor.referee2Lattes http://lattes.cnpq.br/5090248192860158 pt_BR
dc.description.resumo O processo de orçamentação de obras empregado por pequenas e médias empresas normalmente utilizam, em suas composições de custos, índices de consumo retirado das Tabelas de Composição de Preços para Orçamentos (TCPO) da Editora PINI. Tais índices geralmente são baseadas nas características das empresas construtoras que atuam nas regiões sul e sudeste, bem como nos recursos naturais disponíveis nestas regiões, não abrangendo, as técnicas construtivas e a disponibilidade de mão de obra, material e equipamentos de outras regiões. Nesse cenário, tendem a surgir diferenças entre os custos orçados e o efetivo consumo no canteiro de obras, em orçamentos elaborados nas demais regiões do país. Este trabalho objetiva apresentar uma análise da produtividade da mão de obra no serviço de armação em lajes, vigas e pilares de concreto armado, fazendo uma comparação dos índices de mão de obra coletados em obras da cidade de Campina Grande – PB, com os previstos na TCPO 14. Para o estudo foram escolhidas duas obras, na fase de superestrutura, onde foram coletados dados do serviço executado e das horas trabalhadas, sendo assim possível calcular a produtividade e realizar uma análise de custos de mão de obra. De posse dos valores de campo, foi realizada uma comparação com as composições de custos presentes no TCPO 14 para o serviço de armação. Os resultados dessa análise específica indicam que o serviço executado na obra possui uma produtividade bem superior aos indicados na TCPO 14. Concluiu-se, a partir disto, que as empresas estudadas não estão tendo prejuízos com a mão de obra nesses serviços. Porém, se houver um investimento maior na medição da produtividade no canteiro de obras, é possível obter dados, que retratem mais fielmente a realidade da obra e da empresa, a partir de índices de mão de obra próprios, já que foi observada grande variação em relação ao TCPO 14. pt_BR
dc.publisher.country Brasil pt_BR
dc.publisher.department Centro de Tecnologia e Recursos Naturais - CTRN pt_BR
dc.publisher.initials UFCG pt_BR
dc.subject.cnpq Engenharia Civil pt_BR
dc.title Análise dos índices de produtividade de mão de obra no serviço de armação em estruturas de concreto armado - lajes, vigas e pilares. pt_BR
dc.date.issued 2017-08-25
dc.description.abstract The budgeting process used by small and mediumsized construction companies usually uses consumption indexes drawn from the Table of Price Compositions for Budgets (TCPO, by the abbreviation in Portuguese) in their cost compositions. These indexes are generally based on the characteristics of the construction companies operating in the South and Southeast regions of Brazil, as well as, on the natural resources available in these regions not covering construction techniques and the availability of labor, material and equipment from other regions. In this scenario, differences between the budgeted costs and the actual consumption at the construction site tend to appear in budgets elaborated in the other regions of the country. This research aims to present an analysis of labor productivity in the framework service in slabs, beams and pillars made of reinforced concrete comparing labor indexes collected in constructions at the city of Campina Grande PB, with those foreseen in TCPO 14. For the study, two constructions in the superstructure phase were chosen, then data about performed service and worked hours were collected making it possible to calculate the productivity and perform an analysis of labor costs. With field values, a comparison was made with the cost compositions present in TCPO 14 for the framework service. The results of this specific analysis indicate that the service performed at the construction site has a well superior productivity than those indicated in TCPO 14. It was concluded from this, that the companies studied are not suffering from labor losses in these services. However, if there is a greater investment in the measurement of productivity at the construction site, it is possible to obtain data, which more accurately portrays the reality of the work and the company, based on the indices of own labor, since a great variation was observed in relation to TCPO 14. pt_BR
dc.identifier.uri http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23966
dc.date.accessioned 2022-03-21T17:46:46Z
dc.date.available 2022-03-21
dc.date.available 2022-03-21T17:46:46Z
dc.type Trabalho de Conclusão de Curso pt_BR
dc.subject Construção Civil pt_BR
dc.subject Construction pt_BR
dc.subject Concreto armado pt_BR
dc.subject Reinforced concrete pt_BR
dc.subject Armação em estruturas de concreto pt_BR
dc.subject Reinforcement in concrete structures pt_BR
dc.subject Estruturas de concreto armado pt_BR
dc.subject Reinforced concrete structures pt_BR
dc.subject Índices de produtividade pt_BR
dc.subject Productivity indices pt_BR
dc.subject Mão de obra - armação de concreto pt_BR
dc.subject Labor - concrete frame pt_BR
dc.subject Orçamento de obras pt_BR
dc.subject Works budget pt_BR
dc.subject Custo de mão de obra pt_BR
dc.subject Labor cost pt_BR
dc.subject Composição de custos pt_BR
dc.subject Composition of costs pt_BR
dc.subject Produtividade na Construção Civil pt_BR
dc.subject Productivity in Civil Construction pt_BR
dc.subject Lajes pt_BR
dc.subject Slabs pt_BR
dc.subject Vigas pt_BR
dc.subject Beams pt_BR
dc.subject Pilares pt_BR
dc.subject Pillars pt_BR
dc.rights Acesso Aberto pt_BR
dc.creator ARAÚJO, Werlley Targino de.
dc.publisher Universidade Federal de Campina Grande pt_BR
dc.language por pt_BR
dc.title.alternative Analysis of labor productivity rates in the service of reinforcement in reinforced concrete structures - slabs, beams and pillars. pt_BR
dc.identifier.citation ARAÚJO, Werlley Targino de. Análise dos índices de produtividade de mão de obra no serviço de armação em estruturas de concreto armado - lajes, vigas e pilares. Trabalho de Conclusão de Curso (Monografia), Curso de Bacharelado em Engenharia Civil, Centro de Tecnologia e Recursos Naturais, Universidade Federal de Campina Grande - Campina Grande - Paraíba - Brasil, 2017. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23966 pt_BR


Arquivos deste item

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples

Buscar DSpace


Busca avançada

Navegar

Minha conta