dc.creator.ID |
SOUSA, R. W. P. |
pt_BR |
dc.creator.Lattes |
http://lattes.cnpq.br/9472392679225669 |
pt_BR |
dc.contributor.advisor1 |
CHAGAS, Rodrigo Mendes Patrício. |
|
dc.contributor.advisor1ID |
CHAGAS, Rodrigo. M. P. |
pt_BR |
dc.contributor.advisor1Lattes |
http://lattes.cnpq.br/5977213819094643 |
pt_BR |
dc.contributor.referee1 |
CHAGAS, Milton Bezerra das. |
|
dc.contributor.referee2 |
MEDEIROS, Fernanda Karolline de. |
|
dc.description.resumo |
Com o avanço tecnológico e a expansão da construção civil, novos conceitos e ferramentas
surgem como alternativas para melhorar a qualidade das obras, buscando resultados mais
favoráveis. Uma tecnologia de destaque é o Building Information Modeling (BIM) que prever
a identificação de incompatibilidades de projetos e maior rapidez na elaboração de
orçamentos. Desta forma, o presente estudo tem como objetivo verificar a aplicabilidade da
metodologia BIM na elaboração de projetos de instalações elétricas e hidrossanitárias de uma
Unidade Básica de Saúde – UBS, da cidade de Boa Ventura - PB. Para alcançar o objetivo
proposto, os projetos originais em 2D foram analisados e modelados em 3D através do
software Revit. Com os modelos em 3D, verificou-se as interferências entre os projetos e
realizou-se a extração automática dos quantitativos para a elaboração do orçamento. O uso
do BIM resultou na identificação prévia de interferências, possibilitando a correção de 141
conflitos entre elementos construtivos. O levantamento automático de quantitativos acelerou
o processo de elaboração do orçamento das instalações prediais, com um leve acréscimo de
0,11% com o uso do Revit no custo total da obra. Conclui-se com o estudo que a metodologia
BIM é capaz de agregar benefícios na elaboração de projetos de instalações prediais,
proporcionando visualização gráfica de um modelo virtual da obra, identificação de
interferências de projetos antes da execução e extração automática de quantitativos,
agilizando o processo de elaboração do orçamento. |
pt_BR |
dc.publisher.country |
Brasil |
pt_BR |
dc.publisher.department |
Centro de Ciências e Tecnologia Agroalimentar - CCTA |
pt_BR |
dc.publisher.initials |
UFCG |
pt_BR |
dc.title |
Influência da metodologia BIM na orçamentação de projetos de instalações prediais: um estudo de caso de uma obra pública no município de Boa Ventura-PB. |
pt_BR |
dc.date.issued |
2022-03-29 |
|
dc.description.abstract |
With technological advances and the expansion of civil construction, new concepts and tools
emerge as alternatives to improve the quality of works, seeking more favorable results. A
prominent technology is Building Information Modeling (BIM) which provides for the
identification of project incompatibilities and faster budgeting. In this way, the present study
aims to verify the applicability of the BIM methodology in the elaboration of projects of electrical
and hydrosanitary installations of a Basic Health Unit - UBS, in the city of Boa Ventura - PB.
To achieve the proposed objective, the original 2D projects were analyzed and modeled in 3D
using Revit software. With the 3D models, the interference between the projects was verified
and the automatic extraction of the quantitative was carried out for the preparation of the
budget. The use of BIM resulted in the prior identification of interferences, enabling the
correction of 141 conflicts between constructive elements. The automatic survey of quantities
accelerated the process of preparing the budget of the building facilities, with a slight increase
of 0.11% with the use of Revit in the total cost of the work. It is concluded with the study that
the BIM methodology is capable of adding benefits in the elaboration of projects of building
installations, providing graphic visualization of a virtual model of the work, identification of
project interferences before execution and automatic extraction of quantitative, streamlining
the process of budget preparation. |
pt_BR |
dc.identifier.uri |
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/25539 |
|
dc.date.accessioned |
2022-06-07T16:59:04Z |
|
dc.date.available |
2022-06-07 |
|
dc.date.available |
2022-06-07T16:59:04Z |
|
dc.type |
Trabalho de Conclusão de Curso |
pt_BR |
dc.subject |
Obra pública |
pt_BR |
dc.subject |
Public work |
pt_BR |
dc.subject |
Metodologia BIM |
pt_BR |
dc.subject |
BIM methodology |
pt_BR |
dc.subject |
Compatibilização de projetos |
pt_BR |
dc.subject |
Project compatibility |
pt_BR |
dc.subject |
Orçamentos |
pt_BR |
dc.subject |
budgets |
pt_BR |
dc.subject |
Instalações de água fria |
pt_BR |
dc.subject |
Cold water installations |
pt_BR |
dc.subject |
Instalações elétricas |
pt_BR |
dc.subject |
Electrical installations |
pt_BR |
dc.rights |
Acesso Aberto |
pt_BR |
dc.creator |
SOUSA, Renan Willer Pinto de. |
|
dc.publisher |
Universidade Federal de Campina Grande |
pt_BR |
dc.language |
por |
pt_BR |
dc.title.alternative |
Influence of the BIM methodology in the budgeting of building installation projects: a case study of a public work in the municipality of Boa Ventura-PB. |
pt_BR |
dc.identifier.citation |
SOUSA, Renan Willer Pinto de. Influência da metodologia BIM na Orçamentação de projetos de instalações prediais: um estudo de caso de uma obra pública no município de Boa Ventura-PB. 2022. 70 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) – Universidade Federal de Campina Grande, Centro de Ciências e Tecnologia Agroalimentar, 2022. |
pt_BR |