dc.creator.ID |
AGRA, GLESTON CARNEIRO. |
pt_BR |
dc.creator.Lattes |
http://lattes.cnpq.br/9142859463180327 |
pt_BR |
dc.contributor.advisor1 |
FREIRE, Raimundo Carlos Silvério. |
|
dc.contributor.advisor1ID |
FREIRE, R. C. S. |
pt_BR |
dc.contributor.advisor1ID |
FREIRE, R. |
pt_BR |
dc.contributor.advisor1ID |
Freire, Raimundo C. S. |
pt_BR |
dc.contributor.advisor1Lattes |
http://lattes.cnpq.br/4016576596215504 |
pt_BR |
dc.contributor.advisor2 |
GURJÃO, Edmar Candeia. |
|
dc.contributor.advisor2ID |
GURJÃO, E. C. |
pt_BR |
dc.contributor.advisor2ID |
GURJÃO, EDMAR CANDEIA. |
pt_BR |
dc.contributor.advisor2ID |
GURJÃO, EDMAR. |
pt_BR |
dc.contributor.advisor2Lattes |
http://lattes.cnpq.br/9200464668550566 |
pt_BR |
dc.contributor.referee1 |
COSTA, Edson Guedes da. |
|
dc.contributor.referee1ID |
COSTA, E. G. |
pt_BR |
dc.contributor.referee1ID |
COSTA, EDSON G. |
pt_BR |
dc.contributor.referee1ID |
COSTA, E.G. DA. |
pt_BR |
dc.contributor.referee1Lattes |
http://lattes.cnpq.br/3930289115658143 |
pt_BR |
dc.contributor.referee2 |
LUCIANO, Benedito Antonio. |
|
dc.contributor.referee2ID |
LUCIANO, B. A. |
pt_BR |
dc.contributor.referee2ID |
LUCIANO, BENEDITO ANTONIO. |
pt_BR |
dc.contributor.referee2Lattes |
http://lattes.cnpq.br/2390722791029216 |
pt_BR |
dc.description.resumo |
Mediante a possibilidade da conversão de energia elétrica local, é possível que os
consumidores tenham simultaneamente mais de uma fonte para suprir a sua demanda.
Espera-se que o chaveamento entre as fontes e as cargas necessite de um sistema de
supervisão e controle que mantenha a continuidade do serviço, evite reconexões
abruptas e ainda respeite a prioridade de cargas. Neste trabalho propõe-se uma
arquitetura de supervisão para controle para o chaveamento de fontes e cargas, sendo
utilizado como exemplo um sistema fotovoltaico (SFV) conectado à rede elétrica
pública. As comutações das fontes para as cargas são realizadas por chaves de
transferências, que operam de acordo com a prioridade de cargas e devem realizar o
ligamento ou desligamento observando a oferta de energia, evitando-se também o
pagamento de multas por ultrapassagem da demanda. No exemplo de aplicação foram
considerados sistemas fotovoltaicos on grid e off grid, e a utilização de cada um
depende da aplicação e/ou da disponibilidade dos recursos energéticos. Também foi
considerada a presença de um sistema de armazenamento de energia que alimenta um
grupo de cargas essenciais, em horários específicos do dia, incluindo o horário de ponta
e/ou como sistema de emergência, no caso de falha de energia elétrica da rede da
concessionária. Foram realizadas análises dinâmicas e lógicas, via simulação
computacional, para constatação do atendimento dos requisitos e viabilidade do módulo
de monitoramento, controle e comando das chaves. Observou-se que a arquitetura
proposta atende aos requisitos, mantendo a continuidade no serviço e, quando
necessário, priorizando a alimentação de algumas cargas em detrimento de outras. |
pt_BR |
dc.publisher.country |
Brasil |
pt_BR |
dc.publisher.department |
Centro de Engenharia Elétrica e Informática - CEEI |
pt_BR |
dc.publisher.program |
PÓS-GRADUAÇÃO EM ENGENHARIA ELÉTRICA |
pt_BR |
dc.publisher.initials |
UFCG |
pt_BR |
dc.subject.cnpq |
Engenharia Elétrica |
pt_BR |
dc.title |
Automação em sistemas de potência: arquitetura de chaveamento considerando disponibilidade de fontes, demanda e prioridade de cargas. |
pt_BR |
dc.date.issued |
2018-08-24 |
|
dc.description.abstract |
Through the possibility of converting local electrical energy, it is possible that
consumers have more than one source to supply their demand at the same time.
Switching between sources and loads is expected to require a
supervision and control that maintains continuity of service, avoids reconnections
abrupt and still respect the priority of loads. In this work, we propose a
supervision architecture for control for switching sources and loads, being
used as an example a photovoltaic system (SFV) connected to the electrical grid
public. Switching from sources to loads is carried out by
transfers, which operate according to the priority of loads and must carry out the
turning on or off, observing the energy supply, also avoiding the
payment of fines for exceeding demand. In the application example,
considered on grid and off grid photovoltaic systems, and the use of each
depends on the application and/or availability of energy resources. It was also
considered the presence of an energy storage system that feeds a
group of essential loads, at specific times of the day, including peak hours
and/or as an emergency system, in the event of a power failure in the
dealership. Dynamic and logical analyzes were performed via simulation
computational, to verify the fulfillment of the requirements and feasibility of the module
monitoring, control and command of the switches. It was observed that the architecture
proposal meets the requirements, maintaining continuity in service and, when
necessary, prioritizing the supply of some loads to the detriment of others. |
pt_BR |
dc.identifier.uri |
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/27096 |
|
dc.date.accessioned |
2022-09-12T20:18:06Z |
|
dc.date.available |
2012-09-12 |
|
dc.date.available |
2022-09-12T20:18:06Z |
|
dc.type |
Dissertação |
pt_BR |
dc.subject |
Chave de transferência |
pt_BR |
dc.subject |
Sistema fotovoltaico |
pt_BR |
dc.subject |
Sistemas híbridos |
pt_BR |
dc.subject |
Geração distribuída |
pt_BR |
dc.subject |
Redes inteligentes |
pt_BR |
dc.subject |
Transfer key |
pt_BR |
dc.subject |
Photovoltaic system |
pt_BR |
dc.subject |
Hybrid systems |
pt_BR |
dc.subject |
Distributed generation |
pt_BR |
dc.subject |
Smart networks |
pt_BR |
dc.rights |
Acesso Aberto |
pt_BR |
dc.creator |
AGRA, Glêston Carneiro. |
|
dc.publisher |
Universidade Federal de Campina Grande |
pt_BR |
dc.language |
por |
pt_BR |
dc.title.alternative |
Automation in power systems: switching architecture considering availability of sources, demand and priority of loads. |
pt_BR |
dc.identifier.citation |
AGRA, Glêston Carneiro. Automação em sistemas de potência: arquitetura de chaveamento
considerando disponibilidade de fontes, demanda e prioridade de cargas. 2018. 98 fl. Dissertação (Mestrado em Engenharia Elétrica), Programa de Pós-Graduação em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática, Universidade Federal de Campina Grande - Paraíba - Brasil, 2018. |
pt_BR |