dc.description.resumo |
Neste trabalho de conclusão de curso é realizado um estudo de caso afim de comprovar a
eficiência da metodologia de redistribuição de cargas entre as fases para regular a tensão
no ponto de acoplamento comum (PAC) após inserção de geração distribuída fotovoltaica
(GDF). Foi modelada, no software OpenDSS, uma rede de distribuição de energia elétrica
com a presença de GDF, tomando como base uma rede de distribuição real. As simulações
da rede de distribuição modelada foram feitas sem e com a GDF e antes e depois da
correção da elevação de tensão no PAC proposta, afim de analisar se a metodologia deste
trabalho é um método adequado de regulação de tensão no PAC após inserção de GDF.
A partir das simulações, verificou-se que, após a inserção da GDF, ocorreram 141
violações do limite máximo de tensão no PAC exigidos pela ANEEL e essas violações
ocorreram em todos os meses do ano. Após a aplicação da metodologia baseada na
redistribuição de cargas entre as fases em que foram realocadas 27 cargas para a fase em
que a GDF estava conectada (fase 2), sendo 14 cargas retiradas da fase 1 e 13 cargas
retiradas da fase 3, todas as violações do limite máximo de tensão no PAC foram
corrigidas. Com a regulação de tensão no PAC, obtida a partir da redistribuição de cargas
entre as fases, pode-se garantir uma maior segurança aos consumidores e aos
equipamentos instalados na rede de distribuição na qual a GDF está instalada e, ainda,
redução de custos com multas e reparação de equipamentos danificados pelo aumento da
tensão no PAC por parte das concessionárias. |
pt_BR |
dc.publisher.country |
Brasil |
pt_BR |
dc.publisher.department |
Centro de Engenharia Elétrica e Informática - CEEI |
pt_BR |
dc.publisher.initials |
UFCG |
pt_BR |
dc.subject.cnpq |
Engenharia Elétrica. |
pt_BR |
dc.title |
Metodologia para redistribuição das cargas entre as fases para regular a tensão no PAC de uma rede de distribuição de energia elétrica após a inserção de geração distribuída fotovoltaica. |
pt_BR |
dc.date.issued |
2021-10 |
|
dc.description.abstract |
In this course conclusion work, a case study is carried out in order to prove the
efficiency of the load redistribution between phases methodology to regulate the voltage
at the Common Coupling Point (CCP) after insertion of Distributed Photovoltaic
Generation (DPG). It was modeled, in OpenDSS software, an electrical energy
distribution network with the presence of DPG, based on a real distribution network. The
simulations of the modeled distribution network were carried out with and without the
DPG and before and after the proposed correction of the voltage rise in CCP, in order to
analyze whether the methodology of this work is an adequate method of voltage
regulation in the CCP after insertion of DPG. From the simulations, it was verified that
after the insertion of the DPG, there were 141 violations of the maximum voltage limit in
the CCP required by ANEEL and these violations occurred in all months of the year.
After applying the methodology based on the redistribution of loads between phases, 27
loads were relocated to the phase where the DPG was connected (phase 2), in wich 14
loads were removed from phase 1 and 13 loads were removed from phase 3, and all
violations of the maximum voltage limit in the CCP were regulated. With the voltage
regulation in the CCP, obtained from the redistribution of loads between phases, it is
possible to guarantee greater safety for consumers and equipment installed in the
distribution network in which the DPG is installed, as well as a reduction in costs with
fines and repair of equipment damaged by the increase in the voltage in the CCP by the
concessionaires |
pt_BR |
dc.identifier.uri |
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/27601 |
|
dc.date.accessioned |
2022-10-11T16:02:45Z |
|
dc.date.available |
2022-10-11T16:02:45Z |
|
dc.type |
Trabalho de Conclusão de Curso |
pt_BR |
dc.subject |
Energia solar fotovoltaica |
pt_BR |
dc.subject |
Geração distribuída fotovoltaica |
pt_BR |
dc.subject |
Rede de distribuição de energia |
pt_BR |
dc.subject |
Redistribuição das cargas |
pt_BR |
dc.subject |
Ponto de acoplamento comum |
pt_BR |
dc.subject |
Violação do limite máximo de tensão |
pt_BR |
dc.subject |
Regulação de tensão |
pt_BR |
dc.subject |
Photovoltaic solar energy |
pt_BR |
dc.subject |
Photovoltaic distributed generation |
pt_BR |
dc.subject |
Power distribution network |
pt_BR |
dc.subject |
Redistribution of loads |
pt_BR |
dc.subject |
Common coupling point |
pt_BR |
dc.subject |
Violation of the maximum voltage limit |
pt_BR |
dc.subject |
Voltage regulation |
pt_BR |
dc.rights |
Acesso Aberto |
pt_BR |
dc.creator |
NEVES, Nathalia Barbosa. |
|
dc.publisher |
Universidade Federal de Campina Grande |
pt_BR |
dc.language |
por |
pt_BR |
dc.title.alternative |
Methodology for redistribution of loads between phases to regulate the voltage in the PAC of an electricity distribution network after the insertion of photovoltaic distributed generation. |
pt_BR |
dc.identifier.citation |
NEVES, Nathalia Barbosa. Metodologia para redistribuição das cargas entre as fases para regular a tensão no PAC de uma rede de distribuição de energia elétrica após a inserção de geração distribuída fotovoltaica. 2021. 92f. (Trabalho de Conclusão de Curso - Monografia), Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática , Universidade Federal de Campina Grande – Paraíba - Brasil, 2021. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/27601 |