MAURÍCIO, C. F. B.; http://lattes.cnpq.br/7404754165109931; MAURÍCIO, Clarisse Freire Barboza.
Resumo:
The importance of preparing the electrical project of a building is visible, as well
as the presence of a qualified professional to carry out the electrical installation according
to what was projected. In order to carry out a good electrical project or to correct
inadequate electrical installations, it is necessary to carry out the dimensioning according
to the Brazilian Standard 5410 of 2004 for Low Voltage, to ensure that users and
equipment are protected. Therefore, the present work carried out an integral analysis of
the electrical installations of the Municipal School Madre Trautilinde, located in the city
of Areia, brejo paraibano. For this, the components present in the current electrical
installation of the school were listed, the nonconformities present in the installation were
subsequently verified in accordance with the technical standard of the Brazilian
Association of Technical Standards, then the possible improvements for the electrical
installation were analyzed and described. can become adequate. In addition, a suggestion
for electrical installation was presented, in case of replacement of the conductor cables,
since the installation is old, dating from 1999. Subsequently, the budget for the proposed
reform in the work was presented, according to the National System table. Research on
Costs and Indexes of Civil Construction / Caixa Econômica Federal. Finally, the
conclusions of the work and suggestions for continuity were presented.