DSpace/Manakin Repository

Total quality control and Shewart Method as auxiliary tools on the practice of lean construction process.

Mostrar registro simples

dc.description.resumo The paper aims to evaluate the improvement of the civil construction applying the total quality control, Shewart Method, in combination with the lean construction process. Total quality control is all dimensions that influence people's satisfaction and, consequently, business survival. Shewart Method or PDCA Cycle (Plan, Do, Check, and Act) is a path for the application of the processes control. Each part of the PDCA Cycle claims specific actions and metrics. By combining the philosophy of lean construction with total quality control and PDCA Cycle, there is an exciting arrangement; due to the fact, they could contribute to practice and better results of civil construction. The methodology consisted of an applied, exploratory and qualitative research, the bibliographical research made from the survey of theoretical references, combining analysis of the technical documents and interpretation of the same and the elements under study. Total Quality Control (QTC) manages the quality, cost, delivery, morale, and the safety of employees and users. Essentially the total quality control is a management system that associates all dimensions to cover the survival of the company. Shewart Method is the method that analyses the process since the planning phase to the result is obtained in search of continuous improvement and reflects in its four stages. The basis of the philosophy of constant improvement. The characteristics of Total Quality Control and Shewart Method, when applied together, they could collaborate with lean construction and increase the management level of the company. The recommendation revealed congruent and complementary aspects when analyzed with lean construction. The reason for the company's existence is the customer, intrinsic quality, cost management, delivery on correct time and quantity, respect for the customer, as total control of quality's aspects. As having a connection between these three elements cited, they combine theoretical aspects to attain results. The contribution that this article presents is the reflection on complementarity techniques that integrate and attempt positive results for the construction industry. pt_BR
dc.publisher.country Brasil pt_BR
dc.publisher.initials UFCG pt_BR
dc.subject.cnpq Engenharia de Produção. pt_BR
dc.citation.issue 8 pt_BR
dc.title Total quality control and Shewart Method as auxiliary tools on the practice of lean construction process. pt_BR
dc.date.issued 2020
dc.identifier.uri http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/32309
dc.date.accessioned 2023-10-24T18:49:58Z
dc.date.available 2023-10-24
dc.date.available 2023-10-24T18:49:58Z
dc.type Artigo de Evento pt_BR
dc.subject Total quality pt_BR
dc.subject Total quality control pt_BR
dc.subject Qualidade total pt_BR
dc.subject Lean Construction pt_BR
dc.subject Control process pt_BR
dc.subject Shewart Method pt_BR
dc.subject Controle de processos pt_BR
dc.subject Qualité totale pt_BR
dc.subject Contrôle qualité total pt_BR
dc.subject Qualité totale pt_BR
dc.subject Construction allégée pt_BR
dc.subject Processus de contrôle pt_BR
dc.subject Méthode Shewart pt_BR
dc.subject Contrôle de processus pt_BR
dc.rights Acesso Aberto pt_BR
dc.creator VIDOLIN, Ana Celia.
dc.creator ROMANO, Cezar Augusto.
dc.publisher Universidade Federal de Campina Grande pt_BR
dc.language por pt_BR
dc.identifier.citation VIDOLIN, Ana Celia; ROMANO, Cezar Augusto. Total quality control and Shewart Method as auxiliary tools on the practice of lean construction process. In: SIMPÓSIO DE ENGENHARIA DE PRODUÇÃO, 8., 2020. Anais [...]. Caruaru - PE: UNIFAVIP, 2020. ISSN: 2318-9258. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/32309 pt_BR


Arquivos deste item

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples

Buscar DSpace


Busca avançada

Navegar

Minha conta