COSTA, M. G.; http://lattes.cnpq.br/3130938651022861; COSTA, Mariana Gomes.
Resumen:
In this report, the main activities are described, referring to the Integrated Internship curricular component, carried out by the student Mariana Gomes Costa, completing the Electrical Engineering Course, at the Federal University of Campina Grande, at the company Companhia Brasileira de Alumínio, located in the municipality of Sorocaba, state of São Paulo. The internship was carried out in the Operation and Maintenance Sector of the Itupararanga Hydroelectric Plant, under the supervision of Electrical Engineer and Plant Manager Luis Carlos da Silva. At this stage, an asset management methodology applied to power transformers was developed with the development of an analysis tool for maintenance. The activities were developed from 12/15/2021 to 12/12/2022, totaling 1440 hours. The internship experience contributed significantly to professional training and better insertion in the job market, in addition to making it possible to apply technical knowledge learned during the course.