Minimização do makespan em um sistema flexible flow shop scheduling utilizando métodos computacionais em uma organização beneficiadora de minérios.

Mostrar registro simples

dc.creator.ID SOUZA, M. A. A. A. pt_BR
dc.contributor.advisor1 SILVA, Yuri Laio Teixeira Veras.
dc.contributor.advisor1ID SILVA, Y. L. T. V. pt_BR
dc.contributor.advisor1Lattes http://lattes.cnpq.br/8971490719107438 pt_BR
dc.contributor.referee1 ARAÚJO, Maria Creuza Borges de.
dc.contributor.referee1ID ARAÚJO, M. C. B. pt_BR
dc.contributor.referee2 LIMA JÚNIOR, Josean da Silva.
dc.contributor.referee2ID LIMA JÚNIOR, J. S. pt_BR
dc.description.resumo A globalização conectada aos avanços das tecnologias computacionais, fez com que a redução de custos e minimização de desperdícios se tornasse uma necessidade para a sobrevivência no mercado. Nesse contexto, a determinação de um sequenciamento de produção eficaz para empresas que produzem um grande mix de produtos, se caracteriza como uma importante ferramenta de otimização, garantindo a essa empresa maior eficiência produtiva, evitando situações como a ociosidade de recursos produtivos. Considerando o makespan como tempo de conclusão da última tarefa, o presente trabalho tem como objetivo estruturar o sequenciamento de uma empresa beneficiadora de minérios afim de minimizá-lo. Para isso, foram conduzidas entrevistas semiestruturadas com o coordenador do PCP, analista de qualidade e o líder de produção da organização objeto de estudo, a fim de viabilizar a coleta dos dados referentes a linha de produção dos granulados higiênicos. Posteriormente foi realizada a estruturação desses dados, formando cinco instâncias/bases de dados, correspondentes a cinco semanas de produção distintas, as quais, foram utilizadas para obtenção das soluções via LEKIN® e via Heurística Gulosa, que foi formulada especificamente para o problema. Por fim, os resultados alcançados com os experimentos computacionais conduzidos foram comparados, no qual a aplicação da heurística foi 33,08% melhor que o software, a fim de demonstrar o nível de eficiência dos métodos aplicados na resolução do problema em questão. pt_BR
dc.publisher.country Brasil pt_BR
dc.publisher.department Centro de Desenvolvimento Sustentável do Semiárido - CDSA pt_BR
dc.publisher.initials UFCG pt_BR
dc.subject.cnpq Engenharia de Produção. pt_BR
dc.title Minimização do makespan em um sistema flexible flow shop scheduling utilizando métodos computacionais em uma organização beneficiadora de minérios. pt_BR
dc.date.issued 2023-11-28
dc.description.abstract A globalization connected to advances in computer technologies has made cost reduction and waste minimization a necessity for survival in the market. In this context, determining an effective production sequencing for companies that produce a wide range of products is seen as an important optimization tool, ensuring greater production efficiency, and avoiding situations such as the idle use of production resources. Considering makespan as the time for the completion of the last task, this study aims to structure the sequencing of an ore beneficiation company to minimize it. To achieve this, semi-structured interviews were conducted with the Production Control Coordinator, Quality Analyst, and Production Leader of the organization under study, to facilitate the collection of data related to the production line of hygienic granules. Subsequently, the data were structured, forming five instances/databases corresponding to five distinct production weeks, which were used to obtain solutions via LEKIN® and via Greedy Heuristic, specifically formulated for the problem. Finally, the results obtained from the conducted computational experiments were compared, with the heuristic application being 33.08% better than the software, demonstrating the level of efficiency of the methods applied in solving the problem at hand. pt_BR
dc.identifier.uri http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/33456
dc.date.accessioned 2023-12-06T20:07:01Z
dc.date.available 2023-12-06
dc.date.available 2023-12-06T20:07:01Z
dc.type Trabalho de Conclusão de Curso pt_BR
dc.subject Makespan. scheduling. flexible flow shop pt_BR
dc.subject Sequenciamento de produção pt_BR
dc.subject Granulados higiênicos – linha de produção pt_BR
dc.subject Softwaare Lekin® pt_BR
dc.subject Heurística de busca gulosa pt_BR
dc.subject Planejamento e controle da produção pt_BR
dc.subject Production sequencing pt_BR
dc.subject Hygienic granules – production line pt_BR
dc.subject Greedy search heuristic pt_BR
dc.subject Production planning and control pt_BR
dc.rights Acesso Aberto pt_BR
dc.creator SOUZA, Maítala Andréia Andrade Alves de.
dc.publisher Universidade Federal de Campina Grande pt_BR
dc.language por pt_BR
dc.title.alternative Minimizing makespan in a flexible flow shop scheduling system using computational methods in a mineral processing organization. pt_BR
dc.identifier.citation SOUZA, Maítala Andréia Andrade Alves de. Minimização do makespan em um sistema flexible flow shop scheduling utilizando métodos computacionais em uma organização beneficiadora de minérios. 2023. 49f. (Trabalho de Conclusão de Curso – Monografia), Curso de Engenharia de Produção, Centro de Desenvolvimento Sustentável do Semiárido, Universidade Federal de Campina Grande, Sumé – Paraíba – Brasil, 2023. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/33456 pt_BR