MONTE, F. C.; http://lattes.cnpq.br/7098968970795545; MONTE, Franciel de Carvalho.
Abstract:
The present work consists in the creation of a Maintenance Plan for the preservation of the physical structure of the Advanced Basic Health Unit of the city of Belém do Piauí, as a result of the sector not having a maintenance policy and thus not existing Conservation practices and repairs. The Plan is based on the precepts of Total Productive Management (TPM), which is a set of management activities, which integrates all employees, aiming to achieve maximum use of equipment. For the study, there were technical visits and direct interviews with the Municipal Health Secretary who is responsible for the management of UBAS, from November 2016 to February 2017, as well as interviews with professionals from various areas of maintenance with the Purpose of proposing a specific maintenance policy for the sector's needs and the creation of the standard operating procedure (SOP) for inspections and repairs to be carried out. The result obtained for this study was a Construction Maintenance Plan to be executed seeking the maximum availability and useful life of the UBAS building.