Title: Análise comparativa entre Tempo Padrão Estimado através do MOST e aferido via cronoanálise: um estudo de caso na indústria automotiva.
Other Titles: Comparative analysis of standard time estimated via MOST and measured via time study: a case study in the automotive industry.
???metadata.dc.creator???: MAIA, Renato de Albuquerque.
LEITE, Maria Silene Alexandre.
LEITE, João Pereira.
Keywords: Tempo padrão estimado;Sistema MOST;Maynard Operation Sequence Technique - MOST;MOST - Maynard Operation Sequence Technique;Sistema Westinghouse;Cronoanálise;Indústria automotiva;Estudo de caso;Estimated standard time;MOST system;Maynard Operation Sequence Technique (MOST);MOST – Maynard Operation Sequence Technique;Westinghouse system;Time study / Chronoanalysis;Automotive industry;Case study
Issue Date: 2026
Publisher: Universidade Federal de Campina Grande
Citation: MAIA, Renato de Albuquerque; LEITE, Maria Silene Alexandre; LEITE, João Pereira. Análise Comparativa entre Tempo Padrão Estimado através do MOST e aferido via Cronoanálise: um estudo de caso na indústria automotiva. In: XIV SIMPÓSIO DE ENGENHARIA DE PRODUÇÃO, 14, 2026. Anais [...]. João Pessoa-PB, 2026. ISSN: 2318-9258. Disponível em: https://dspace.sti.ufcg.edu.br/handle/riufcg/47477
???metadata.dc.description.resumo???: A indústria automotiva opera em um ambiente global altamente competitivo, onde a precisão na definição dos tempos padrão é crucial para o planejamento da capacidade produtiva e a competitividade. Este artigo tem como objetivo mensurar a diferença percentual entre o tempo padrão estimado pelo sistema MOST (Maynard operation sequence techinique) e o tempo padrão aferido por cronoanálise para um produto específico (FSB) em uma fabricante de autopeças do Nordeste brasileiro. A metodologia consistiu em um estudo de caso exploratório, com coleta de dados quantitativos por meio da aplicação do MOST, seguindo procedimentos padronizados da empresa, e da cronoanálise, envolvendo filmagem de ciclos, avaliação de ritmo (Sistema Westinghouse) e cálculo do tempo padrão. Os resultados indicaram que o tempo padrão estimado pelo MOST (23,80 minutos) foi 27,61% superior ao definido pela cronoanálise (18,65 minutos), com variações significativas entre os tipos de costura. Conclui-se que a superestimação do tempo pelo MOST pode impactar negativamente a competitividade da empresa, sugerindo a necessidade de revisão da metodologia atual.
Abstract: The automotive industry operates in a highly competitive global environment, where the accuracy in defining standard times is crucial for production capacity planning and competitiveness. This paper aims to measure the percentage difference between the standard time estimated by the MOST (Maynard operation sequence techinique) system and the standard time measured by stopwatch time study for a specific product (FSB) in an automotive industry in the Brazilian Northeast. The methodology consisted of an exploratory case study, with quantitative data collection through the application of MOST, following the company's standardized procedures, and stopwatch time study, involving cycle filming, pace rating (Westinghouse System), and standard time calculation. The results indicated that the standard time estimated by MOST (23.80 minutes) was 27.61% higher than that defined by stopwatch time study (18.65 minutes), with significant variations between types of seams. It is concluded that the overestimation of time by MOST can negatively impact the company's competitiveness, suggesting the need for a revision of the current methodology.
Keywords: Tempo padrão estimado
Sistema MOST
Maynard Operation Sequence Technique - MOST
MOST - Maynard Operation Sequence Technique
Sistema Westinghouse
Cronoanálise
Indústria automotiva
Estudo de caso
Estimated standard time
MOST system
Maynard Operation Sequence Technique (MOST)
MOST – Maynard Operation Sequence Technique
Westinghouse system
Time study / Chronoanalysis
Automotive industry
Case study
???metadata.dc.subject.cnpq???: Gerência da Produção.
Engenharias.
URI: https://dspace.sti.ufcg.edu.br/handle/riufcg/47477
ISSN: 2318-9258
Appears in Collections:014º Simpósio de Engenharia de Produção - SIMEP

Files in This Item:
File Description SizeFormat 
ANÁLISE COMPARATIVA ENTRE TEMPO PADRÃO - ANAIS XIV SIMEP ARTIGO 2026.pdfAnálise comparativa entre Tempo Padrão Estimado através do MOST e aferido via cronoanálise: um estudo de caso na indústria automotiva. - Anais XIV SIMEP Artigo 20262.18 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.