Please use this identifier to cite or link to this item: https://dspace.sti.ufcg.edu.br/handle/riufcg/46537
Title: Relatório de Estágio Integrado.
Other Titles: Integrated Internship Report.
???metadata.dc.creator???: REIS, Rafaella Michel.
???metadata.dc.contributor.advisor1???: ACIOLI JÚNIOR, George.
Keywords: Estágio integrado;Engenharia Elétrica;Redes aéreas;NR-10;Seccionamento de linhas;Integrated internship;Electrical engineering;Overhead distribution lines;Occupational safety;Power systems
Issue Date: 19-Dec-2025
Publisher: Universidade Federal de Campina Grande
Citation: REIS, Rafaella Michel. Relatório de Estágio Integrado. 2025. 31f. Relatório de Estágio (Bacharelado em Engenharia Elétrica) - Universidade Federal de Campina Grande, Centro de Engenharia Elétrica e Informática, Campina Grande, Paraíba, Brasil, 2025. Disponível em: https://dspace.sti.ufcg.edu.br/handle/riufcg/46537
???metadata.dc.description.resumo???: Este relatório apresenta as atividades desenvolvidas durante o Estágio Integrado em Engenharia Elétrica, realizado na empresa CG3 Engenharia Ltda., no contexto da obra de seccionamento da linha de distribuição LD 69 kV Centro/Ribeira – SE Petrópolis, em Natal/RN. O estágio compreendeu períodos de acompanhamento em campo e períodos em regime remoto a partir de Campina Grande/PB, envolvendo atividades técnicas e rotinas administrativas relacionadas à execução da obra. A capacitação inicial em NR-10 Básico e NR-10 Complementar (SEP) forneceu a base normativa e de segurança necessária para atuação junto a redes aéreas de média e alta tensão. Em campo, foram observadas etapas como implantação de postes de concreto, lançamento de cabos e organização das frentes de serviço em ambiente urbano. Em paralelo, foram desenvolvidas atividades de organização de documentação técnica, apoio à gestão de custos e interação com fornecedores. De forma geral, o estágio contribuiu para aproximar os conteúdos da graduação da prática profissional em obras de infraestrutura elétrica.
Abstract: This report presents the activities carried out during the Integrated Internship in Electrical Engineering, conducted at CG3 Engenharia Ltda. in the context of the sectioning works of the 69 kV distribution line Centro/Ribeira – SE Petrópolis, in Natal, Brazil. The internship included on-site field participation and remote work from Campina Grande, covering technical tasks and administrative routines related to the execution of the project. The initial training in NR-10 Basic and NR-10 Complementary (SEP) provided the safety and regulatory background required for activities involving medium and high-voltage overhead networks. Field activities included observing pole installation, cable stringing and the organization of work fronts in an urban environment. In parallel, the intern supported the organization of technical documentation, cost monitoring and communication with service providers. Overall, the internship helped to bridge academic learning and professional practice in electrical infrastructure projects.
Keywords: Estágio integrado
Engenharia Elétrica
Redes aéreas
NR-10
Seccionamento de linhas
Integrated internship
Electrical engineering
Overhead distribution lines
Occupational safety
Power systems
???metadata.dc.subject.cnpq???: Engenharia Elétrica
URI: https://dspace.sti.ufcg.edu.br/handle/riufcg/46537
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio

Files in This Item:
File Description SizeFormat 
RAFAELLA MICHEL REIS - RELATÓRIO DE ESTÁGIO – ENGENHARIA ELÉTRICA - (CEEI) 2025.pdfRAFAELLA MICHEL REIS - RELATÓRIO DE ESTÁGIO – ENGENHARIA ELÉTRICA - (CEEI) 20252.33 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.